Page 54 - GM Booklet 06.03.2021_Neat
P. 54

SIGNALLING & TELECOMMUNICATION



                                                       SIGNALLING


               1.   New S&T service buildings constructed at 11 mid-section interlocked LC gates.
                    (234A,10JB, 7JB, 5JB,17JB, 219, 217,187,193,185 & 189A) and provided  Mini IPS
                    systems  along  with  battery  banks  and  solar panels.  In  overall,  36  midsection  LC
                    gates have been provided with IPS out of total 38 mid-section interlocked LC gate in
                    the division. Removed old location  boxes  at  these gates and shifted relay wiring to
                    new  service  building.

                    Bifurcation  of  Power  supply  in  Automatic  territory  STPD`A'-KCG,  KCG-FM  (2
                    locations), MJF –CVB and  BMO-CVB section carried out for non-blanking of Signals
                    by providing separate AT and IPS with battery bank in new service building and
                    commissioned.














               2.   Existing 08 Mechanically Operated Lifting barrier (MOLB) at interlocked LC gates
                    replaced  with  Electrically  Operated  Lifting  barrier  (EOLB)  at  LC 68, LC.2/MLY,
                    LC27, LC28, LC47, LC145, LC155 & LC 189A In overall 25 LC gates out of total
                    interlocked 78 LC gates have  been completed.














               3.   Emergency standby Sliding Boom Barriers provided at 10 interlocked LC gates.
                    In  overall,  68  interlocked  LC  gates  have  been  provided  with  sliding
                    booms out of total 78 interlocked LC gates in the division.
















                                                            45
   49   50   51   52   53   54   55   56   57   58   59