• Wire trays wire inserted through the secondary beam . at
         first, I thought it might be fault, but structure engineer
         guided me that it was possible to do so and was not fault
         in constructions.


                                  • The     presence    of
                                     uneven surface in
                                     the   wall    require
                                     more thickness of
                                     plaster to achieve
                                     even         surface
                                     sometime            if
                                     thickness     exceed
                                     more than 30mm
                                     then wire mesh are
                                     used










                                                                                   • Wall of 250 thick is
                                                                                      left to place the
                                                                                      concealed     cistern
                                                                                      then            after
                                                                                      placement finishing
                                                                                      is  done   with   15
                                                                                      mm      of   plaster
                                                                                      work






  • This id how curing is done in slab
     for 5-7 days


                                • Duct are left for the
                                   transmission    of   pipe
                                   from floor to floor but
                                   the pies coming out
                                   from basin shower and
                                   wc       cannot        be
                                   predictable so during
                                   construction    void    is
                                   created directly below
                                   the    slab   and     are
                                   hidden by false ceiling




          80