Sill band of 4”
                                                                                       thick as the bar
                                                                                       needed to in the
                                  The door frame                                       center but     due
                                  is lifted to the                                     to lockdown and
                                  level of the floor                                   lack             of
                                                                                       supervision
                                                                                       there          was
                                                                                       mistaken.













                 When the construction of the wall reachess
                 to the 1/3rd of the height door frame are
                 placed and leveled as shown in figure . for
                 the    continuation     of   the    brick    work
                 construction joints are provided.
























                                     For the construction of wall above the
                                     slab .the slab is kept moist and cleaned
                                     then 20-30 mm mortar is placed and
                                     above the mortar brick is laid and
                                     slightly pressed.