Page 33 - final report_Neat
P. 33
FORM DEVELOPMENT
PHASE 1
FORM DEVELOPMENT
Building is offsets 5m from the road as directed by the bye law. Since the site lacked
the visibility form the coming traffic and there was not enough transition space for the
public flow which is much necessary in case of commercial building for proper public
and basement entry following form was developed.
PHASE 2
1
1 2
2
3
4
3 4
18