Professional Practice: Guideline for Quantity Surveyor                         Chapter 2


                            Completion of Project Brief.

                            Application for detailed planning permission

                          Technical Design

                            Preparation of technical design(s) and specifications, sufficient to co-ordinate
                              components  and  elements  of  the  project  and  information  for  statutory

                              standards and construction safety.



                   2.6.5  Tender

                          Production Information
                            Preparation of detailed information for construction

                            This includes :-
                              -  All working drawings – Architectural / structural / services etc.
                              -  All schedules – door / window / drainage / reinforcement etc.

                              -  Specifications – construction methods /
                            Quantity  Surveyor  prepares  the  Bill  of  Quantities  (BQ)  by  taking  all  the

                              material requirements off the working drawings.
                            BQ consist lists of material, item by item, (all the materials and components
                              which are required to construct the project.)

                            Application for statutory approvals.
                            Once Building Regulations approval is obtained, a detailed cost estimate is

                              carried out.

                          Tender Documentation

                            Preparing  the  various  tender  documents  and  checking  to  see  if  they  any
                              special terms required by the client.

                            Architect  will  select  method  of  tendering  to  be  used  and  produce  all  the
                              tender documents.

                            When the project is approaching the tender stage, the different firms that may
                              be interested in constructing the project should be invited to tender