Page 56 - 2016 NAmer Autumn TD
P. 56

Developing a 10-Year Pump                             Developing a 10-Year Valve
        Inservice Testing Program                             Inservice Testing Program

        PD595                                                 PD596

        This course teaches participants how to develop a Pump-IST (Inservice   Upon completion of this course, you will be able to develop a Valve-
        Test) Program that the NRC will accept and approve. It covers the full   IST (Inservice Test) Program that complies with all NRC requirements.
        range of Pump-IST requirements, including general concepts, the   Following an introduction of the subject matter, it goes into general
        scope of Pump-IST, overviews of ISTA and ISTB, pump testing, program   concepts, scope of Valve-IST, overviews of ISTA and ISTC, program
        preparation, comprehensive pump test, pump vibration, risk-informed   requirements and guidance, valve testing, program preparation,
        initiatives, performance-based initiatives and two case studies. It    condition-monitoring for valve test, risk-informed initiatives, performance-
        focuses specifically on the NRC required 10-year updates of the    based initiatives, and two case studies.  It highlights NRC required,
        Pump-IST Program.                                     10-year updates of the Valve-IST Program.
        Although the course is geared toward IST engineers working at a plant,   While designed primarily for IST Engineers working at a plant, or IST
        or IST program regulators with five to ten years of experience in the   Program regulators with five to ten years’ experience, new engineers in
        nuclear industry, it also teaches engineers, who are new to the field,    the nuclear industry will also learn many of the basics related to safety
        the basics of safety systems and standby equipment.   systems and standby equipment.
        You Will Learn To                                     You Will Learn To
        •    Explain how to perform 10-year updates of the Pump-IST program  •   Explain how to perform 10-year updates of the Valve-IST program
        •   Identify the latest Pump-IST requirements, including ASME OM-2012   •  Identify the specific requirements of the ASME OM Code,
         Division 1 (OM Code), Subsection ISTB
                                                               Subsection ISTC
     NUCLEAR Public Courses  Who Should Attend                Who Should Attend
                                                              •  Identify relevant Valve-IST requirements
        •    Describe Pump-IST strengths and weaknesses
                                                              •   Describe the latest thinking on Valve-IST strengths and weaknesses
        •   Explain details of current and future regulatory changes affecting
         Pump-IST
                                                              •  Identify current and likely future regulatory changes affecting Valve-IST
                                                              Inservice testing engineers and regulators, project managers,
        Inservice test engineers, maintenance engineers, inservice testing
        program regulators, licensing engineers
                                                              engineering managers with risk assessment responsibilities
        Instructor C. Wesley (Wes) Rowley
                                                              Instructor C. Wesley (Wes) Rowley
                                                              3 Days, 2.3 CEUs, 15 PDHs
        2 Days, 1.5 CEUs, 15 PDHs
        Member $1,450 / List Price $1,550
                                                              Member $1,895 / List Price $1,995
        by the instructor.
                                                              by the instructor.
          Also available as Online Instructor-Supported Course EL523, led    Also available as Online Instructor-Supported Course EL521, led



































   54
   51   52   53   54   55   56   57   58   59   60   61