                 COMMISSIONING A HIGH






                 PRESSURE GAS CONNECTION




                 MANAGEMENT OF DESIGN, PROCUREMENT, INSTALLATION AND TESTING FOR A 40MWE POWER GENERATION STATION

                 By Samuel Ezeonyeka, Assistant Project Manager (Gas Connections)   of its kind for UKPR and had unique
                 for UK Power Reserve and YPPC 2019 finalist                       challenges.
                                                                                     Prior to this project, I had
                 UK POWER RESERVE (UKPR), part    added an environmental improvement to   successfully delivered medium and
                 of Sembcorp Group is a fast-growing   all future sites by ensuring our gas skids   intermediate pressure gas connections
                 Midlands-based power company.    are housed with an acoustic gas kiosk   to over 25 UKPR sites.
                 UKPR’s gas reciprocating engines use   to reduce the noise level with minimal   This was my first encounter with
                 the expansion of gases to drive a piston   impact on our surroundings.   high pressure gas connections and the
                 within a cylinder and convert the                                 following section explores my roles
                 piston’s linear movement to a circular   The project              and responsibilities, the challenges
                 (or rotating) movement of a crankshaft to   In early 2018, I was part of a team   encountered, and the methodology
                 generate electricity to the grid (Figure 1).   tasked with objectives to develop and   deployed to resolve those challenges.
                   These reciprocating engines ramp   build a 40MWe power generation
                 up within two minutes to full capacity   station to meet our contractual   Roles and responsibilities
                 of 2MW of electricity per engine.   obligations for the 2015 Capacity   I report directly to UKPR Head of
                 Figure 1 shows our typical model   Market (CM15).                 Connections on gas. I manage contractors
                 site which generates approximately   Within the team, I was fully   whose roles and responsibilities are
                 20MW of electricity (20MWe) to the   responsible for the management   highlighted in Figure 2.
                 grid at 5000Nm³/h gas flow rate and   and delivery of a high pressure gas
                 52,226kW/h gas load capacity.    connection to our site in Derby. This   Challenges and solutions
                   On a daily basis, I am responsible   involved a pressure reduction of   Key challenges of the project included:
                 for the on-time delivery of gas at the   38bar (normal operating pressure) to
                 appropriate volume, temperature and   250/260mbar (required pressure at    Temperature At normal operating
                 pressure to our reciprocating engines. I’ve   the engines). This project was a first   pressure of 38bar, the inlet temperature

                 FIGURE 1 20MWE UKPR SITE                         FIGURE 2 CONTRACTOR ROLES AND RESPONSIBILITIES
                                                                    DESIGN APPROVAL                    SECONDARY PRESSURE
                                                                                                         REDUCTION SKID
                                                                     CONNECTING TO                       FROM 7BAR TO
                                                                     CADENT’S LOCAL   ASSISTANT PROJECT MANAGER   250/260MBAR
                                                                   TRANSMISSION SYSTEM   (GAS CONNECTIONS)
                                                                     (LTS) AT 38BAR

                                                                    CADENT + NATIONAL   CNG SERVICES LTD/  FUTURE UTILITY   FUTURE METERING
                                                                     GRID METERING  GAS UNIE  SOLUTIONS   SERVICES

                                                                               PRE-HEATER MODULE &   DOWNSTREAM 7BAR IP
                                                                               PRESSURE REDUCTION   PE & ST GAS PIPE
                                                                                STATION FROM 38BAR
                                                                                  TO 7BAR
                                                                  FIGURE 4 PRE-HEATER MODULE INSTALLED AT DERWENT


                 FIGURE 3 THROTTLING THROUGH A POROUS PLUG


















          38



                                                                                                                  16/01/2020   16:02
        IGEMNews_YPPC.indd   1
        IGEMNews_YPPC.indd   1                                                                                    16/01/2020   16:02
   33   34   35   36   37   38   39   40   41   42   43