Page 28 - EOI_Wallace Bishop Retail Redevelopment
P. 28

QUALITY MANAGEMENT SYSTEM



















                                                               QUALITY MANAGEMENT SYSTEM
                                                               SJ Higgins Group has developed and implemented a
                                                               comprehensive quality system that is accredited to ISO
                                                               9001.

                                                               The system has been designed to ensure that SJ Higgins
                                                               Group complies with all applicable legislation and provides
                                                               employees, contractors and clients with transparent
                                                               procedures and processes to maintain quality standards
                                                               and production Values.

                                                               In keeping with lean construction methodologies our
                                                               overarching company philosophy is the elimination of
                                                               “waste” across all constructions processes. From basic
                                                               waste reduction of site materials through to more process
                                                               orientated tasks for defect management, safety management
                                                               and environmental management.

                                                               The SJ Higgins Group have implemented a high tech,
                                                               web based, company intranet system which ensures that
                                                               all employees have immediate access to procedures,
                                                               legislation and the most up to date standard forms that are
                                                               the back bone of our Quality, Safety and Environmental
                                                               procedures.


                                                               EXTERNAL CERTIFICATION
                                                               SJ Higgins has a comprehensive Quality Management
                                                               System which is certified to International Standard 9001-
                                                               Quality Management Systems (issued 10/02/10)


                                                               INSPECTION AND TEST PLANS (ITP’S)
                                                               All contractors are required to supply SJ Higgins Group with
                                                               project specific ITP’s upon completion of their works. SJ
                                                               Higgins Group  also completes high level ITP’s to double
                                                               check the quality of our contractor’s works.


                                                               HANDOVER
                                                               SJ Higgins has developed a comprehensive procedure to
                                                               ensure that projects are handed over to the client on time
                                                               and defect free. Our Quality System outlines procedures
                                                               that cover efficient management of defect inspections with
                                                               the client, Guidelines on producing best practice handover
                                                               manuals, how to manage miscellaneous equipment
                                                               transfers to the client and managing the final handover
                                                               process to ensure maximum client and end user satisfaction.







          28
   23   24   25   26   27   28   29   30   31   32   33