Page 12 - BER Company Brochure
P. 12
Massachusetts Universities
• New Nursing School building with Classrooms, O’Connor Hall - Renovation of the roof drains at O’Connor
Laboratory, Offices. Operating Room mock-up, Hall.
Meeting Rooms and Lecture spaces.
• DCAMM Study – Athletics Building Challenger Center and Planetarium – Renovations to
• Childcare Center – Plumbing improvements. O’Connor Hall with selective areas of work and the addition
of the Challenge Center entry Lobby, an elevator tower, and a
• DCAMM Study – Admin Building Planetarium.
• DCAMM Study – Child Study Building Corrine Towers – HVAC system renovations.
• Admin Building - Boiler condensate system and Feasibility Study - Feasibility Report to convert a Dorm into
domestic water system replacements
Office space.
Carney Hall
• Bathroom renovations on all floors.
• Fourth floor renovations/fit-up of existing office Administration Building - Air conditioning system for the
area for College Police Department.
Maloney Hall – First floor Police Dispatch Administration building.
renovations and second floor Police Command Dental Clinic– Renovation of existing Dental Suite to allow
Center, Data Room and Locker Room renovations. for proper spacing of the chairs and additional space for
teaching.
Art Center – Phase I Feasibility Study for the addition of a
handicap ramp at the Tilden Arts Center main auditorium
Jones, Wallace & Ewen Dorms – Electrical service Nickerson Library - Renovation of the Wilkins Library, for
upgrades for all (3) buildings and (2) new Utility the Nickerson Collection archive material, reading room,
compact storage and circulation desk. The space will include
Company owned pad mounted transformers to an Inergen fire suppression system.
support the (3) buildings.
Alumni, Dean & Memorial Halls – Replacement
and upgrades of domestic waterlines and fire
protection services from street systems.
.
Duffy Academic Building – Selective demolition and
renovations to convert classrooms into office space and office
New Student Center – Addition to Lombard hall and space into classrooms.
connector Alumni Hall for new Student Center. MacPhaidin Library CID Space – Renovation of Campus
Library selective areas for new space requirements.
New (80) bed dormitory building with “suite” style
design in multiple buildings. Dower Center – Roof replacement for Wings C and D.
Medical Campus L&R Buildings – Modifications
of the existing fire alarm system on the 7 floor.
th
66 Main Street North Easton, MA 02356 T 508.230.0260 F 508.230.0265 www.ber-engineering.com
351 Centerville Road Warwick, RI 02886 T 401.384.7682
D E S I G N | K N O W L E D G E | S O L U T I O N S