Page 14 - BER Company Brochure
P. 14
Massachusetts Universities
• New Nursing School building with Classrooms, O’Connor Hall - Renovation of the roof drains at O’Connor
Laboratory, Offices. Operating Room mock-up, Hall.
Meeting Rooms and Lecture spaces.
• DCAMM Study – Athletics Building Challenger Center and Planetarium – Renovations to
• Childcare Center – Plumbing improvements. O’Connor Hall with selective areas of work and the addition
of the Challenge Center entry Lobby, an elevator tower, and a
• DCAMM Study – Admin Building Planetarium.
• DCAMM Study – Child Study Building Corrine Towers – HVAC system renovations.
• Admin Building - Boiler condensate system and Feasibility Study - Feasibility Report to convert a Dorm into
domestic water system replacements
Office space.
Carney Hall
• Bathroom renovations on all floors. Administration Building - Air conditioning system for the
• Fourth floor renovations/fit-up of existing office
area for College Police Department. Administration building.
Maloney Hall – First floor Police Dispatch Dental Clinic– Renovation of existing Dental Suite to allow
renovations and second floor Police Command for proper spacing of the chairs and additional space for
teaching.
Center, Data Room and Locker Room renovations. Art Center – Phase I Feasibility Study for the addition of a
handicap ramp at the Tilden Arts Center main auditorium
Nickerson Library - Renovation of the Wilkins Library, for
the Nickerson Collection archive material, reading room,
compact storage and circulation desk. The space will include
Medical Campus L&R Buildings – Modifications an Inergen fire suppression system.
th
of the existing fire alarm system on the 7 floor.
Jones, Wallace & Ewen Dorms – Electrical service .
upgrades for all (3) buildings and (2) new Utility Duffy Academic Building – Selective demolition and
renovations to convert classrooms into office space and office
Company owned pad mounted transformers to
support the (3) buildings. space into classrooms.
Alumni, Dean & Memorial Halls – Replacement MacPhaidin Library CID Space – Renovation of Campus
and upgrades of domestic waterlines and fire Library selective areas for new space requirements.
protection services from street systems.
New (80) bed dormitory building with “suite” style design in
multiple buildings.
New Student Center – Addition to Lombard hall and
connector Alumni Hall for new Student Center.
Dower Center – Roof replacement for Wings C and D.
66 Main Street North Easton, MA 02356 T 508.230.0260 F 508.230.0265 www.ber-engineering.com
351 Centerville Road Warwick, RI 02886 T 401.384.7682
D E S I G N | K N O W L E D G E | S O L U T I O N S