Page 13 - BER Company Brochure
P. 13

Bridgewater State University



                  Art Center
                  • New lobby entrance and first floor single use
                   bathroom.                                    Pope Hall
                  •  New hot water boilers and HVAC             •  Interior renovations including a new
                   renovations and minor modifications to
                   building mounted fire alarm system.             sprinkler system, new fire alarm system and
                                                                   lobby renovations and a (176) bed addition.
                  Campus Control Systems                           Project received LEED Silver Certification.

                  •  Coordination for a new Campus Control      Rondileau Campus Center
                    System.  Integration for the Dorm           •  New air conditioning system in Campus
                    renovations.                                   Center.

                 Dormitory Renovations                          •  Career Services/Internship new office.
                 •  Renovations to all dormitories on a yearly   •  Bear sculpture lighting

                    Summer Program for bathrooms and lobby      Science Building
                    areas.                                      •  Photonics Lab renovations and system

                 East Campus Commons                               upgrades
                 •  RTU equipment replacement                   •  Mahler-Farina Science and Mathematics
                 •  Hot water heater replacement                   Labs interior renovations

                  Great Hill Apartments
                  •  Complete renovation of HVAC, electrical    Scott Hall
                                                                •  Interior renovations including a new
                    and plumbing systems in the four (4)           sprinkler system, new fire alarm system and
                    building apartment complex.                    lobby renovations and a (131) bed addition.
                  •  New heating system                            Project received LEED Silver Certification.

                  Harrington Hall                               Shea/Durgin Hall
                  •  Decentralization report and renovation for a   •  Plumbing system upgrades and program
                    new gas fired boiler plant for Dorm.
                                                                   space on the first floor for University use.
                                                                •  Hot water heaters renovations.
                 Maxwell Library
                  •  DCAMM Certified Study for HVAC system       Stonehouse Hall
                    modifications.                               •  Hot water heater system replacement for
                                                                   Dormitory.
                  Miles/DiNardo Hall                             •  Fan coil replacement for Dormitory.
                 •  Interior renovations of Student bathrooms,
                    corridors, lounges and Res-Life offices with   Tillinghast Hall
                    new and upgrades of all “MEP/FP” systems.   •  Reconfiguration of Print/Copy Room, toilet
                                                                   renovations and the creation of (3) small

                                                                   offices.






               66 Main Street   North Easton, MA 02356  T 508.230.0260  F 508.230.0265  www.ber-engineering.com

                            351 Centerville Road     Warwick, RI 02886     T 401.384.7682

                 D  E  S  I  G  N      |     K  N  O  W  L  E  D  G   E     |     S  O  L  U  T  I  O  N  S
   8   9   10   11   12   13   14   15   16   17   18