Page 17 - BER Company Brochure
P. 17
Rhode Island Universities
Adams Library – Consolidation/relocation of Student
Services.
Gaige Hall/Lee Hall – Renovation of (2) buildings.
New Residence Hall: - New Residence Dorm building of
approximately 128,000gsf with a combination of suites
with (1) and (2) bedrooms , single and double occupancy
apartments totaling (366) beds. Project is LEED Certified.
Henry Barnard Building – HVAC/Electrical revisions
for Classrooms and Support space including emergency
lighting, fire alarm and Tel/Data.
STEM Projects- Electrical systems upgrades for Smart
Classroom systems including lighting controls and power
for projects for Clark Science Building, Fogarty Hall, Jonathan Nelson Entrepreneurship Center – New 4-story
Horace Mann Hall and Gaige Hall. mixed used building of approximately 10,500sf. Levels 2-4
Yellow House – Mechanical/Electrical upgrades for include Learning and Research Center, Lecture Hall with
Administration Offices, Conference Rooms, Reception breakout spaces, work spaces for Student and Faculty,
and Meeting Rooms. general storage and support spaces, (2) restrooms and
Building #7 – Renovations and upgrades of all electrical janitors closet on each level.
systems. Sharpe House – Electrical engineering for the relocation,
Donovan Hall – Dining Hall renovation and emergency renovation and addition to an existing building.
generator back up for entire Facility.
Nazarian Performance Arts Center – Due Diligence
Study and Report.
Aquinas Hall – Roof renovations
St. Joseph Hall – Renovations for new single dorm rooms
McDermott Hall – Restroom and various mechanical
st
nd
• Academic Center – 1 & 2 floor renovations renovations
• Online Education School – New Admin Dept. offices. Fennell Hall – Dorm renovations
• Richmond Building – 1 floor renovations
st
• Bookstore - MEP/FP renovations
• Harborside Kiosk – MEP/FP renovations
• Rec Center Offices – MEP/FP renovations
• Physicians Assist Building – Adaptive reuse of existing
infrastructure building
• Harborview Dorms – MEP/FP services for renovations Chace Gymnasium – Renovation and locker expansion
• Friedman Center – Graduate Classroom renovations Strength/Conditioning Center– New 10,000sf facility
• Culinary Arts Building – Renovations Salmanson Dining Hall/Cafeteria – Renovations and new
kitchen
Residence Hall 14 – Rooftop equipment replacement with
piping and ducts modification in Residence Hall 14.
RISD-ISB (BUILDING REHAB)
• Complete restoration of the existing Arts Building and
new multi-level addition.
66 Main Street North Easton, MA 02356 T 508.230.0260 F 508.230.0265 www.ber-engineering.com
351 Centerville Road Warwick, RI 02886 T 401.384.7682
D E S I G N | K N O W L E D G E | S O L U T I O N S