Page 17 - BER Company Brochure
P. 17

Rhode Island Universities





               Adams Library – Consolidation/relocation of Student
               Services.
               Gaige Hall/Lee Hall – Renovation of (2) buildings.
               New Residence Hall: - New Residence Dorm building of
               approximately 128,000gsf with a combination of suites
               with (1) and (2) bedrooms , single and double occupancy
               apartments totaling (366) beds. Project is LEED Certified.
               Henry Barnard Building – HVAC/Electrical revisions
               for Classrooms and Support space including emergency
               lighting, fire alarm and Tel/Data.
               STEM Projects- Electrical systems upgrades for Smart
               Classroom systems including lighting controls and power
               for projects for Clark Science Building, Fogarty Hall,   Jonathan Nelson Entrepreneurship Center – New 4-story
               Horace Mann Hall and Gaige Hall.              mixed used building of approximately 10,500sf.  Levels 2-4
               Yellow House – Mechanical/Electrical upgrades for   include Learning and Research Center, Lecture Hall with
               Administration Offices, Conference Rooms, Reception   breakout spaces, work spaces for Student and Faculty,
               and Meeting Rooms.                            general storage and support spaces, (2) restrooms and
               Building #7 – Renovations and upgrades of all electrical   janitors closet on each level.
               systems.                                      Sharpe House – Electrical engineering for the relocation,
               Donovan Hall – Dining Hall renovation and emergency   renovation and addition to an existing building.
               generator back up for entire Facility.
               Nazarian Performance Arts Center – Due Diligence
               Study and Report.

                                                             Aquinas Hall – Roof renovations
                                                             St. Joseph Hall – Renovations for new single dorm rooms
                                                             McDermott Hall – Restroom and various mechanical
                                st
                                    nd
               •  Academic Center – 1  & 2  floor renovations   renovations
               •  Online Education School – New Admin Dept. offices.   Fennell Hall – Dorm renovations
               •  Richmond Building – 1  floor renovations
                                  st
               •  Bookstore - MEP/FP renovations
               •  Harborside Kiosk – MEP/FP renovations
               •  Rec Center Offices – MEP/FP renovations
               •  Physicians Assist Building – Adaptive reuse of existing
                 infrastructure building
               •  Harborview Dorms – MEP/FP services for renovations   Chace Gymnasium – Renovation and locker expansion
               •  Friedman Center – Graduate Classroom renovations   Strength/Conditioning Center– New 10,000sf facility
               •  Culinary Arts Building – Renovations       Salmanson Dining Hall/Cafeteria – Renovations and new
                                                             kitchen
                                                             Residence Hall 14 – Rooftop equipment replacement with
                                                             piping and ducts modification in Residence Hall 14.



               RISD-ISB (BUILDING REHAB)
               •  Complete restoration of the existing Arts Building and
                 new multi-level addition.

         66 Main Street   North Easton, MA 02356   T 508.230.0260   F 508.230.0265   www.ber-engineering.com

                          351 Centerville Road      Warwick, RI 02886     T 401.384.7682

               D   E  S  I  G  N     |     K  N  O  W  L  E   D  G  E      |     S  O  L  U  T  I  O  N  S
   12   13   14   15   16   17   18   19   20   21   22