Page 354 - 2006 HARLEY FLSTCI SERVICE MANUAL
P. 354
6-21
2006 Softail: Wiring
3 Figure 6-22. Inspect Core and Insulation/Seal Crimps
Insulation crimp
Insulation Core crimp
2
d0260x8x 1 1. 2. 3.
Lay the back of the core crimp tails on the appropriate
nest. Be sure the core crimp tails are pointing towards
Gently apply pressure to handles of tool until crimpers
slightly secure the core crimp tails. Insert stripped wire between crimp tails. Verify that wire is positioned so that short pair of crimp tails squeeze bare wire strands, while long pair folds over insulation or Squeeze handle of crimp tool until tightly closed. Tool automatically opens when the crimping sequence is Determine the correct dye or nest for the insulation/seal Lay the back of the insulation/seal crimp tails on the appropriate nest. Be sure the insulation/seal crimp tails are pointing towards the forming jaws. Squeeze handle of crimp tool until tightly closed. Tool automatically opens when
the forming jaws. seal material. complete. complete.
HOME 4. 5. 6. 7. 8. crimp. 9. 10. 11.