Page 98 - EOSedge installation Documents
P. 98
EOS 90427-A-PHY-0009-PDU X-ray Chain Power On.docx
22. Put the Collision Exit switch service back to OFF in the PDU - All service switches should be OFF
now.
23. Wait a few minutes and start the turn on sequence again.
a. Start the system by pressing the ON button on the console.
b. Start the login sequence and enter the PLC user interface
24. After a minute, navigate and open the 'System manager' interface in the Visus
25. Wait another minute and check that all subsystems are in “Idle” status.
26. Task completed