Page 278 - Civil Engineering Project Management, Fourth Edition
P. 278

Index
                          258
                          Concrete (contd)
                                                                 construction supervision 93
                            beam test 241
                                                                 direct labour construction 21
                            characteristic strength 239
                                                                 EPC contract 26
                            compliance with standards 240
                                                                 feasibility studies 18
                            construction joints 251            Consultant, use on
                            conveyance and placing 250           turnkey contract 25
                            density of 248                     Consultant, form of agreement 49
                            finish problems 252                Contingency sums 39
                            mixes 236–40                       Contract conditions, see Conditions of
                            production, practical points 245       contract
                            shrinkage 253                      Contract documents 50 et seq.
                            site checks on quality 248         Contract drawings 54
                            testing requirements 240           Contract parties, roles of 51
                            test failure causes 247            Contract price fluctuation 32
                            workability 243, 246               Contractor’s:
                          Concrete reinforcement 253–5           accounting methods 84
                            maximum bar length 254               agent 81
                            wiring up 254                        initial work on site 121
                          Concrete shuttering 255                interim payment applications 152
                          Conditions of contract 40–9            office siting 140
                            FIDIC  45, 48, 51                    programme 99, 121, 165, 167
                            GC/Works/1 46                        risks 35
                            ICE standard 40, 51                  safety responsibilities 100, 108, 109, 110
                            ICE design and construct 42          site personnel 80 et seq.
                            ICE – ECC conditions 43, 52          use of plant 85
                            ICE ground investigation 41          use of quantity surveyors 84
                            ICE minor works 42                   use of subcontractors 86–8
                            I Chem E 48                        Coordination of contracts 57, 59
                            I Mech E 47–8                      Cost curve use 36–7
                            JCT (Joint Contracts Tribunal) 46  Cost control of project 39
                          Confirmation of verbal instructions   Cost estimating a project
                             (CVIs) 99, 146                      at promotion stage 36
                          Construction Best Practice             at design stage 37
                             programme 9, 15                     estimating final cost 176–7
                          Construction defects, handling of 101  use of payment graph 170
                          Construction (Design and Management)  Cost parameters 38
                             Regulations (CDM) 93, 107–9       Cost reduction problems 39
                            Code of practice for 111           Cost reimbursement contracts 3, 31
                          Construction (Health, Safety & Welfare)  Critical path planning 172, 213
                             Regulations 115                   CVIs, confirmation of verbal
                          Construction, fast completion 69         instructions 99, 146
                          Construction management 23             put in as claims 212–13
                          Construction options 20
                            by trades 21, 29                   Dayworks:
                            direct labour 20                     authorisation and rates 153–7
                            design and construct 24–5            filing system for 155
                            design, build and operate (DBO) 25  Defective work:
                            engineer, procure and construct      handling of 101, 211
                             (EPC) 26                            non payment for 198
                            management contracting 23          Delays:
                            partnering 8, 26                     avoidance of 165
                            term or serial contracts 26, 43      claims for 217–19
                            turnkey 24                           due to exceptional weather 218
                          Construction payment methods 29 et seq.  due to slow progress by contractor 174
                          Construction safety, see Health & Safety  estimating cost of 218–19
   273   274   275   276   277   278   279   280   281   282   283