Page 279 - Civil Engineering Project Management, Fourth Edition
P. 279
Index
Design options 24 et seq.
see ECC
Design and construct options 4, 24
Excavating and earth placing machinery
contract conditions for 42
225–7
variations under 219
Excavation:
Design, build and operate (DBO) Engineering & Construction Contract, 259
contracts 4, 25, 32 bulking factors 229
Design completion before tendering formation trimming 227
desirability 69, 223 spoil haulage problems 228
Dewatering site 142 Excavation measurement:
Direct labour construction 20 billing problems 182–4
undertaken by consultant 21 in rock 183, 184
Drawings 54, 97, 99 working space problems 185
need to destroy those superseded 162 Ex-contractual payments 34
record 162 Extensions of time 175, 217–18
register of 147 Extra bill items policy 152, 198–9
resident engineer’s checking 92–3 Extranet systems 12
Extras, avoidance of interest
charges 220–1
Earth filling 229–31
achieving optimum moisture
content 230 Facilities management 10
compaction factor influence 230 Fast completion requirements 69, 224
in situ tests 137 Feasibility studies:
watching fill quality 230–1 importance of 17, 18, 50
EC procurement regulations 15 data check requirements 18
EC rules on tendering 65–7 FIDIC conditions 2, 45, 48, 89
ECC Conditions, provisions of 43–4, 91 cash flow estimate needed 171
delay cost assessment 219 employer to be consulted on
project manager under 10, 52, 104 claims 206
variations and claims 104, 209, engineer’s powers under 51, 92
215, 220 for M & E work 48
weather definition 218 payment time allowed 197
Egan report 8 prequalification standard form 68
Employer’s representative or project subcontracting restraints 86
manager 42, 46 Foundation bearing value 136
under ECC conditions 10, 43–4, Framework agreements 11
52, 91, 104 FRPO sheets (for record purposes
Employer’s: only) 155, 213
discussions with resident
engineer 125–6
limit on variations 91, 208 Gateway process 15
role under contract 51, 89 Grading apparatus for soils 137
Engineer: Ground data to be provided 60–1
duties under ICE conditions 89,
91–2, 94
employer appoints 89 Haulage roads 138
issue of variation orders 206 Haulage economics 228–9
limits to powers 91–2 Health & Safety Executive 108
need to consult employer on claims 45, code of practice 110, 111–12
91–2, 206–7 notification requirements 108
provides all design drawings 92 Health & Safety regulations 107 et seq.
role under contract 41, 51 1994 construction (CDM)
safety responsibilities 100 regulations 107
Engineer, procure and construct (EPC) 1996 construction (welfare)
contracts 26 regulations 115