Page 281 - Civil Engineering Project Management, Fourth Edition
P. 281
Pre-commencement meeting 120
One stop shop 15
Preliminaries bill problems 189–93
Opening tenders 71
Prequalifying tenderers 67–8
Operational contracts 10
Price variation provisions 32
Ordered variations 208
records of 157 Index 261
Pricing and payment
Partnering 8, 26 adjustment item 73, 194
addendum to ICE ECC conditions 44 on overseas contracts 21, 29, 36
Payment estimating 170–1 principles of 178
Payment items problems of CESMM 193
bonus 33 Prime contracting
bill of quantities 29, 197 Prime cost items 188–9
ex-contractual 24 Programme:
extra work, dayworks, claims 198 acceptance of contractor’s 165
item missed 208, 212 Progress records 147, 167
lump sums, method related items, bar charts 167–70
adjustment item 199 critical path analysis 171–2
materials on or off site, shipped overseas payment graph 170–1
200–2 quantity diagrams 172, 173
prepayments 34 time schedule of key dates 168
price adjustment 202 Project manager’s role under ECC 6, 10,
retention money 204 43–4, 52, 91, 104
Payment methods for construction 29 Project promotion methods compared 27
et seq. Promoter’s:
cost reimbursement 31, 203 acquisition of powers 1
overseas, use of standard rates 29 choice of design method 19–20
rates only 29 construction options 20 et seq.
target contracts 32 obligations 17
Payment principles 178–9 risks 35
Payments, cash flow, effect on price 74 use of consultant 18, 19
Payments late, interest charges 220 Provisional quantity problems 182–3
Payments, timing requirements 196–7 Provisional sums, use of 183
Performance bond 204 Public road work requirements 140
Performance tests 161–2
Performance v. method specification
62–3 Quality assurance 16, 93
PFI private finance initiative 7, 10, 13 Quantity records 149–52
Pipelines 232–5 Quantity surveyors 5, 80
backfill requirements 233 in building work 47
gradients for 233 in civil engineering work 84, 197, 198
handling large diameter specials 234 Quotations from contractor
jointing requirements 234–5 for variations 40, 219–20
measurement of 185 under design and construct
testing of 234 contracts 220
thrust block design 232
Planning supervisor, see Safety Manager
Plant for construction, rates for 85 Rates for:
Plant installation 21–2, 59 increased quantities 207
contract conditions 47–9 ordered variations 208
delivery arrangements 59 Rates only contracts 29
performance tests 162 Record drawings 162–3
need to check delivery 166 Records 144
Plant supply contracts 57 dayworks 153–7
PPP private public partnership 8 of drawings 147
Preamble to bill of quantities 195 of tests 161