Page 280 - Civil Engineering Project Management, Fourth Edition
P. 280
Index
260
Health & Safety regulations (contd)
Levelling, surveying, setting out 129–32
1999 management (at work)
Liquidated damages 204
regulations 112
Lump sum contracts 3, 209
other regulations 115–19
for plant 48
Health & Safety requirements Letter of intent 78
designer’s duties 108 for turnkey (or design and construct)
file 110, 164 24
plan 109, 121, 123 price effect of 31
planning supervisor’s duties 108 variations under 31, 209
principal regulations applying 107,
112, 115
resident engineer’s duties 100 M4i (Movement for information) 15
Management contracting 23, 42
risk assessment requirements 113–14 claims under 24–5
training requirements 111
Housing Grants, Construction & Materials:
logging sources of 164
Regeneration Act 1996 6, 33, on site, payment for 157
196, 221
supplied under separate
contracts 63, 158–61
ICE conditions of contract 40 et seq. Materials and workmanship:
arbitration provisions 223 action if inadequate 211
clause 12 provisions 214–16 checking quality 97, 99, 101–2
engineer’s independence under 41, specification 61–2
51, 89 Measurement and bills of
engineer’s responsibilities under 89, quantities 179 et seq.
92, 94 accuracy of quantities 182
important points to watch 99 agreeing quantities 197–8
limitations on engineer’s powers 91–2 billing methods 184–7
resident engineer’s powers under 97 billing problems 181
risk apportionment 35 CESMM 180, 183, 193
safety duties of contractor 108 classification of items 181
safety duties of resident engineer 100 extra items procedure 191
subcontract form used 49, 187 for building work 83
subcontracting allowed 86 for concrete 186
variations under 207–9 for earthworks 186
Information technology 11 for pipelines 185
In-situ density tests 137, 229 for rock 184
Inspection of materials 97, 98, 99, 200–1 method-related items 189, 191
for transhipment overseas 202 preamble to bill of quantities 195
Inspector’s duties 105 preliminaries bill problems 189, 192
checking of dayworks 155 provisional quantities 182
daily returns 147–9 quantity records 149–52
Instructions to tenderers 63 Mechanical and electrical work 21–2,
Instructions to contractor 98, 99, 101 47–9, 57, 59
Insurance requirements 55 Method-related items 189, 191,
Interest chargeable on late payments 220 192–3, 199
Minimizing claims and disputes 223
Job completion reports 163
Joint ventures 15 Network diagrams 171–4
New Engineering Contract 6
see also ECC Conditions
Key performance indicators 15
Nominated subcontractors and
suppliers 166, 187–8
Labour risks on contractor 351 difficulities in using 87, 166
Latham report 6 use of named products 63