Page 280 - Civil Engineering Project Management, Fourth Edition
P. 280

Index
                          260
                          Health & Safety regulations (contd)
                                                               Levelling, surveying, setting out 129–32
                            1999 management (at work)
                                                               Liquidated damages 204
                             regulations 112
                                                               Lump sum contracts 3, 209
                            other regulations 115–19
                                                                 for plant 48
                          Health & Safety requirements         Letter of intent 78
                            designer’s duties 108                for turnkey (or design and construct)
                            file 110, 164                          24
                            plan  109, 121, 123                  price effect of 31
                            planning supervisor’s duties 108     variations under 31, 209
                            principal regulations applying 107,
                             112, 115
                            resident engineer’s duties 100     M4i (Movement for information) 15
                                                               Management contracting 23, 42
                            risk assessment requirements 113–14  claims under 24–5
                            training requirements 111
                          Housing Grants, Construction &       Materials:
                                                                 logging sources of 164
                             Regeneration Act 1996 6, 33,        on site, payment for 157
                             196, 221
                                                                 supplied under separate
                                                                   contracts  63, 158–61
                          ICE conditions of contract 40 et seq.  Materials and workmanship:
                            arbitration provisions 223           action if inadequate 211
                            clause 12 provisions 214–16          checking quality 97, 99, 101–2
                            engineer’s independence under 41,    specification 61–2
                             51, 89                            Measurement and bills of
                            engineer’s responsibilities under 89,  quantities 179 et seq.
                             92, 94                              accuracy of quantities 182
                            important points to watch 99         agreeing quantities 197–8
                            limitations on engineer’s powers 91–2  billing methods 184–7
                            resident engineer’s powers under 97  billing problems 181
                            risk apportionment 35                CESMM 180, 183, 193
                            safety duties of contractor 108      classification of items 181
                            safety duties of resident engineer 100  extra items procedure 191
                            subcontract form used 49, 187        for building work 83
                            subcontracting allowed 86            for concrete 186
                            variations under 207–9               for earthworks 186
                          Information technology 11              for pipelines 185
                          In-situ density tests 137, 229         for rock 184
                          Inspection of materials 97, 98, 99, 200–1  method-related items 189, 191
                            for transhipment overseas 202        preamble to bill of quantities 195
                          Inspector’s duties 105                 preliminaries bill problems 189, 192
                            checking of dayworks 155             provisional quantities 182
                            daily returns 147–9                  quantity records 149–52
                          Instructions to tenderers 63         Mechanical and electrical work 21–2,
                          Instructions to contractor 98, 99, 101   47–9, 57, 59
                          Insurance requirements 55            Method-related items 189, 191,
                          Interest chargeable on late payments 220  192–3, 199
                                                               Minimizing claims and disputes 223
                          Job completion reports 163
                          Joint ventures 15                    Network diagrams 171–4
                                                               New Engineering Contract 6
                                                                 see also ECC Conditions
                          Key performance indicators 15
                                                               Nominated subcontractors and
                                                                   suppliers 166, 187–8
                          Labour risks on contractor 351         difficulities in using 87, 166
                          Latham report 6                        use of named products 63
   275   276   277   278   279   280   281   282   283   284   285