1.8.4.7 Packing requirements (Provided by Party A).
1.8.4.8 Intermittent production plans to be provided by Party B (Provided by
Party B).
1.9 Requirements on submission of drawings and related data.
1.9.1 Party B shall submit three sets of complete instructions to Party A for the
unloading, storage, installation, operation and maintenance of all equipment.
1.9.2 Design drawings: submission to the Employer and review process.
1.9.2.1 Preliminary submission - one duplicable version and five copies.
1.9.2.2 Secondary submission - one duplicable version and five copies.
1.9.2.3 Submittals for final distribution (drawings issued by the manufacturer):
three copies and three CDs.
1.9.2.4 “As-built” drawings issued by the manufacturer: two copies and three
CDs.
1.9.2.5 “As-built” drawings issued by the manufacturer: two copies and three
CDs.
Party A: PT. BAGUS KARYA
Party B: PT. ENERGI INDONESIA PERSADA
Legal representative: Legal representative:
Mr. HENRY KURLI Mr. SUTOYO
or authorized representative: or authorized representative:
Date of signing: Date of signing: