Control of Industrial Major Accident Hazards (CIMAH) Report   Page       12
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                                  Part D: Information on the Potential Major Accident   Date        Aug 2019


                   •  Traffic Impact  -  the  plant  is  self-contained  and  surrounded  by  a  perimeter
                       fence,  a  traffic  system  is  in  operation  within  the  plant  and  therefore  the
                       likelihood of on-site traffic accidents is expected to be remote.

               D.2.4 Potential of Major Accident

               The hazardous events, which could lead to a major accident that can occur within
               KT1 & KT2 WTP are discussed in the following sections.

               Kampung Tengah 1 Water Treatment Plant

               In this study, three (3) incident scenarios were modelled and considered to be the
               event that result in loss of containment of Chlorine to the surrounding environment
               leading to major accident hazard / event. Scenarios modelled as follows:

                   •  Scenario  1:  Chlorine  Cylinder  Catastrophic Failure / Rupture  (Door
                       Opened)
                       Instantaneous  release  of  Chlorine  during  changeover  activities  where  the
                       Chlorine storage door is opened. Changeover activities are carried out every
                       week and estimated last for 2 hours. Therefore, the chance of the Chlorine
                       Room  door  being  opened  to  allow  the  Chlorine  gas  dispersion  is  1.19%
                       probability (2 hours a day and 7 days a week per year).

                   •  Scenario 2: Chlorine Cylinder 50mm Hole Diameter Leak (Door Opened)
                       Leak  on  the  Chlorine  cylinder  shell  with  50mm  hole  diameter  during
                       changeover activities where the Chlorine Room door is opened. Changeover
                       activities carried out every week and estimated last for 2 hours. Therefore, the
                       chance  of  the  Chlorine  Room  door  being  open  to  allow  the  Chlorine  gas
                       dispersion is 1.19% probability (2 hours a day and 7 days a week per year).

                   •  Scenario 3: Chlorine Cylinder 10mm hole Diameter Leak (Door Opened)
                       Leak  on  the  Chlorine  cylinder  shell  with  10mm  hole  diameter  during
                       changeover activities where the Chlorine Room door is opened. Changeover
                       activities carried out every week and estimated last for 2 hours. Therefore, the
                       chance  of  the  Chlorine  Room  door  being  open  to  allow  the  Chlorine  gas
                       dispersion is 1.19% probability (2 hours a day and 7 days a week per year).