CONSTRUCT





        C2 External Works






        C2.1 Ducts and Draw Pits

        New ducts installed must be provided by 100mm
        dia  UPVC  flexiduct  laid  min  cover  -300mm,
        more typically -600mm below local finish level;
        final depths to be designed by contractor to suit
        site ground  conditions. Straight ducts must be
        retained in place with concrete  haunches at
        min 1200mm centres. Any bends within the duct
        to be fully set in concrete and must be formed
        in propriety 100mm dia swept bends (not tight
        90 degrees).


        Proprietary  draw pits  should be installed  as
        required where numerous ducts congregate
        for pulling into the building or further around the
        site. Duct chambers to be 600x600mm footprint
        with proprietary flush metal cover plates.


        All ducts to be laid with draw wires ready for
        pulling of electrical cables.

        All installed ducts should be sealed at each
        end on completion using wire mesh (max 10mm
        gaps) set in expanding foam, min 100 deep.



































         C2.1           Ducts and Draw Pits                 1.0                        08 October 2014