Page 279 - B6118-AEW-XX-XX-PP-A-0001_(P16)_Contractors Manual
P. 279

CONSTRUCT











          C2.3 Installation of Patio Furniture





          Buton                                                  Aubrillam

          Where  patio furniture  is being  installed over       Where  patio furniture  is being  installed over
          a block  paved  patio,  each  piece of  furniture      a block  paved  patio,  each  piece of  furniture
          must be bolt fixed into a specific mass concrete       must be bolt fixed into a specific mass concrete
          foundation installed below the line of the block       foundation installed below the line of the block
          paviour.                                               paviour.


          Where  patio furniture  is being  installed over  a    Where  patio furniture  is being  installed over  a
          slabbed patio, each piece of furniture must be         slabbed patio, each piece of furniture must be
          bolt fixed into the slabs.                             bolt fixed into the slabs.


          Bolts will be provided by the furniture supplier for   Bolts will be provided by the furniture supplier for
          this process as part of the furniture order. Each      this process as part of the furniture order.
          specific  furniture  item  must  have  a  minimum
          number of bolts installed:                             Further information on this can be found in the
                                                                 documents below.
          Rectangular tables           2No
          Circular tables              2No
          Trash bins                   4No                       - Buton Furniture
          Sit up bars                  16No
          (every available fixing location hole)                 - Guideline E3 Mix 2015_EN_Europe_BD
          Planters                     No requirement
          Cigarette disposal unit      3No


          Bolting down  of  the  cigarette  disposal  unit  to
          an individual  mass  concrete foundation  can
          often  be problematic. With agreement  from
          the project manager, this unit can be secured
          in position by bolt connection to the side of a
          trash bin.




















           C2.3           Installation of Patio Furniture      2.0                       15 January 2016