Page 50 - B8773-AEW-XX-XX-PP-A-0001_[P8]_Contractors Manual
P. 50

2.9.5 ‘Make line’ and Slap Table Monitor Shrouds
       Where the slap table/make line backs onto a           Be aware that:
       wall, the three wall mounted monitors must be         a)  the  makeline  monitor  should  face  towards
       shrouded by black monitor shrouds. Additional         the counter
       monitors may also be required - refer to drawings.    b)  the  monitor  at  the  makeline  -  slap  table
       •  The surrounds require installation by the main     junction should face away from the makeline
          contractor.  The  monitors, brackets, small        c) the monitor near the front of the slap table
          power and data points must be installed in         should face towards the makeline
          the usual manner, concealed by the shroud
       •  Sockets, data points, monitor brackets and         Where  the  slap  table/make  line  doesn’t  back
          the  black  shroud  should  be  fitted  by  the    onto a wall, i.e. a sneeze screen, the monitors
          shopfitter  prior  to  installation  of  screens  by   should be pole mounted from the ceiling.
          DPG IT team
       •  The tiles inside the shroud should be covered      Refer  to  drawings  for  details  of  other  screens
          by BLACK vinyl by the sign contractor.             (shoulder surf, etc)
       •  ALL  sockets  and data points inside the
          shroud should be BLACK
       •  There are also angled front faced shrouds,
          so angled monitors sit comfortably
       •  The boxes will have two sets of fixing holes to
          ensure  left  and  right-handed  mounting,  so
          there is no need to order anything bespoke



































       2.9.5                       ‘Make line’ and Slap Table Monitor Shrouds            30 May 2018