1.2 Stall Risers
          support frame be constructed under the pipe on the inside A F T


          Where  possible,  shop  fronts  are  to  be  glazed
          down  to  400mm  above  internal  floor  level,  or
          such other dimension as the drawings indicate
          for each project.


          Externally, stall risers are normally to be finished in
          powder coated aluminium panels to RAL 7043.


          Alternatively  a  150  x  150mm  dark  grey  tile,  to
          match RAL 7043 may be used.

          Internally, the stall riser is to be finished in grey
          laminate Abet 879 Grigio Grafite (to match
          RAL 7043 Traffic Grey)

          NOTE: that if a gas pipe is to enter through a thin timber/
          aluminum  stallriser,  the  gas  suppliers  will  require  that  a


          of the stall riser, to relieve any future strain on the gas pipe
          elbow. The gas meter must be installed within a lockable,
          30 minute fire rated cupboard that is ventilated to fresh air
          through the stall riser.  D R



































          1.2                        Stall Risers                                           3 February 2016