3.1 Office
                            D R A F T




       The  full  height,  office  ‘Comms  Cupboard’         The cabinet will contain  patch panels to enable
       has  been  replaced  by  a  slightly  wider  version   the equipment to be plugged into the internal
       with  modified  internal  wiring,  sockets  etc.  This   network  (patch panel to be wired by the site
       cupboard will not only contain the IT equipment       electrician) and a power bar which needs only
       but also the CCTV equipment and possibly the          to be plugged into a standard 13aS/S/O.
       Phone system unit .
                                                             The patch panels and power bars will be supplied
       Ideally it should be positioned adjacent to the       as part of the counter and comms cupboards,
       desk, exactly as in the past, however it is slightly   to be wired only, by the site electrician.
       wider and if it is not possible to sit it against the
       desktop, it can be moved elsewhere.                   A  detailed  drawing  for  the  comms  cupboard
                                                             can be found here.
       NOTE: That in this case, additional cables will need to be
       run by the site electrician from the cabinet to the desktop.