Upon completion the electrical installation shall A F T


          4.2.7 Oven and Fan Wiring                             4.2.9 Best Practice Guidance
          The  main  site  electrician  will  be  required  to    Where  the  electric  meter  is to  be  located
          supply  simple  on/off  switches  and  wire  to       internally,  the  following  preparatory  works  will
          isolator adjacent to each fan.                        be required:
                                                                •  Install 50mm entry ducting to below internal
          The electrical supply to each oven socket must            meter  position  to  exit  building  at  minimum
          be independent, so that in the event that one             450mm below the outside surface level
          circuit breaker trips, power is  not lost to both     •  Install  fireproof  back  board  (sizes  are
          ovens at the same time. Note also that although           approximately  2000mm  high  x  1000mm
          the PS 200/540 and XLT3255 ovens will run from a          wide) and to be sited between 500mm and
          standard twin 13a S/S/O, the PS360EWB and PS              2000mm above finished floor level
          555 will require 2No. 20A rated sockets & plugs       •  All  internal  cabling  and  meter  tails  to  be
             alarm panel.D R
          (Reyrolle type)                                           installed by a qualified electrician ready for
                                                                    connection to the meter


          4.2.8 Testing and Completion                          On site excavation
                                                                For stores with a private forecourt or private land
                                                                within its boundary, on site excavation will  be
          be fully tested, proved and working.                  your responsibility (unless otherwise specified).

          •  Full test results and the appropriate              Best practice on site excavation
             certification shall be provided for all electrical   •  Install  minimum  125mm  plastic  rigi  duct
             systems including  emergency lights and fire           from  the  store  to  the  boundary  edge  (this
             alarms.                                                changes in colour dependent upon area so
          •  An  emergency  telephone  number  for  the             please refer to the quote and utility drawing)
             electrician, MUST be written on the fire alarm     •  Duct must be fitted with a draw cord
             panel  for  use  in  the  event  of  electrical/   •  To  be  laid  approximately  600mm  deep
             operating faults.                                      (specification will be in quote)
          •  The reset code MUST be written on the fire         •  Overlay  duct  with  caution  warning  marker
                                                                    tape
          •  Provide a comprehensive operation  and
             maintenance  manual  including  details  of
             the  systems  installed  and  record  drawings
             indicating  the  layout  and  interconnections
             of all items.
          •  Allow to  demonstrate  the  operation  of  all
             electrical systems to the end user at hand
             over.
          •  Final invoices will not  be paid until test
             certificates are received.