4.2.2 Electrical Services
• All electrical contractors employed on • All wiring and cable containment shall be
ANY Domino’s site, whether self-build or DP concealed within the building fabric and
UK&I Ltd build, MUST be either ECA or NEIC within the false ceiling void.
Registered. • All wiring must be run in suitable conduits or
• The project includes all of the Electrical cable trays.
Services work associated with the fitting out • Final locations of all outlets and equipment
of an existing unit to create a fully operational shall be in accordance with the DGP
Domino’s pizza delivery store. Standard layouts and fully coordinated
• The Electrical Contractor shall be responsible with other trades. Any deviations from the
for detailed design, supply, installation, co- standard details must be agreed with the
ordination with other disciplines, testing and Project Manager/Client prior to installation.
commissioning for all items as detailed in this • All wiring, including computer, telecoms
specification and accompanying drawings. and electrical, within the counter, shall be
• All works shall be carried out in accordance run in suitable trunking terminated through
with the latest relevant British and European standard boxes. It is the responsibility of
Standards including BS7671 (17th Ed IEE the Main Contractor to ensure that this
Wiring Regulations or subsequent updates/ is complied with by his electrical sub-
revisions), current at the time of installation. contractor.
• Data and telecoms cables must each
The works shall include: emerge from walls/trunking in suitable back
• Removal and disposal of any existing boxes and be positioned so that standard
redundant installations. modular face plates may be fitted.
• Mains distribution equipment. • Earth bonding of fixed metal equipment
• General lighting. shall be carried out by the site electrician
• Emergency lighting. as required by the Regulations.
• External lighting. • Installation of RCBO’s is expected where
• Small power. “Best Practice” would call for their use,
• Fixed power to equipment and signage. even in discretionary or ‘grey areas’ of the
• Computer cabling. regulations.
• Fire Alarm. • Final circuit testing MUST be in full compliance
• Telephone wiring. with the appropriate regulations.
• Door bell.
• Testing and commissioning.
• Provision of record documentation.
• User/Client demonstration and training.
4.2.2 Electrical Services 3 February 2016