       4.2.2 Electrical Services
       •  All electrical contractors employed on             •  All  wiring  and  cable  containment  shall  be
          ANY Domino’s site, whether self-build or DP            concealed  within  the  building  fabric  and
          UK&I Ltd build, MUST be either ECA or NEIC             within the false ceiling void.
          Registered.                                        •  All wiring must be run in suitable conduits or
       •  The  project  includes  all  of  the  Electrical       cable trays.
          Services work associated with the fitting out      •  Final locations of all outlets and equipment
          of an existing unit to create a fully operational      shall be in accordance with the  DGP
          Domino’s pizza delivery store.                         Standard layouts and fully coordinated
       •  The Electrical Contractor shall be responsible         with other  trades. Any deviations  from the
          for detailed design, supply, installation, co-         standard  details  must  be  agreed  with  the
          ordination with other disciplines, testing and         Project Manager/Client prior to installation.
          commissioning for all items as detailed in this    •  All  wiring,  including  computer,  telecoms
          specification and accompanying drawings.               and electrical, within the counter,  shall be
       •  All works shall be carried out in accordance           run  in  suitable  trunking  terminated  through
          with the latest relevant British and European          standard  boxes.  It  is the  responsibility of
          Standards  including  BS7671  (17th    Ed  IEE         the  Main  Contractor  to  ensure  that  this
          Wiring  Regulations  or  subsequent  updates/          is  complied  with  by  his  electrical  sub-
          revisions), current at the time of installation.       contractor.
                                                             •  Data and telecoms cables  must each
       The works shall include:                                  emerge from walls/trunking in suitable back
       •  Removal  and  disposal  of  any  existing              boxes and be positioned so that standard
          redundant installations.                               modular face plates may be fitted.
       •  Mains distribution equipment.                      •  Earth  bonding  of  fixed  metal  equipment
       •  General lighting.                                      shall  be  carried  out  by  the  site  electrician
       •  Emergency lighting.                                    as required by the Regulations.
       •  External lighting.                                 •  Installation  of  RCBO’s  is  expected  where
       •  Small power.                                           “Best  Practice”  would  call  for  their  use,
       •  Fixed power to equipment and signage.                  even in discretionary or ‘grey areas’ of the
       •  Computer cabling.                                      regulations.
       •  Fire Alarm.                                        •  Final circuit testing MUST be in full compliance
       •  Telephone wiring.                                      with the appropriate regulations.
       •  Door bell.
       •  Testing and commissioning.
       •  Provision of record documentation.
       •  User/Client demonstration and training.