          •  The ventilation control panel supplier will also
             provide a suitable 42mm gas solenoid valve
             for installation, in the oven supply pipe, by
             the main contractor’s plumber.
          •  It is the main contractor’s  responsibility  to
             ensure that the gas pipe is purged through
             the  valve  before  hand-over  of  the  system.
             If this is not done and the oven installers are
             unable  to  complete  their  commissioning,
             any subsequent call backs will be charged
             to the main contractor.

          •  In  all  cases,  the  final  “Quick  Disconnect”
             gas  hoses  and  fittings  will  be  supplied
             and  installed  by  the  oven  commissioning
             engineer.