• The ventilation control panel supplier will also
provide a suitable 42mm gas solenoid valve
for installation, in the oven supply pipe, by
the main contractor’s plumber.
• It is the main contractor’s responsibility to
ensure that the gas pipe is purged through
the valve before hand-over of the system.
If this is not done and the oven installers are
unable to complete their commissioning,
any subsequent call backs will be charged
to the main contractor.
• In all cases, the final “Quick Disconnect”
gas hoses and fittings will be supplied
and installed by the oven commissioning
engineer.