Page 394 - Installation Training Binder FIT1-3
P. 394
4. Remove the containment walls carefully and note the orientation of the
components.
I. Install Barriers
Always check for rebar or underground obstructions before drilling!
1. Using the drill bit provided, drill holes to 1” depth at previously marked
locations. Clean drill holes as you go (Figure 22).
2. Insert drop-in floor anchors and insure top of anchor is flush with floor.
3. Place containment walls back over the perimeter to check alignment and
hole accuracy.
4. Using the anchor punch tool set the drop-in floor anchors into the floor.
Drill to 1” depth
Figure 22 Figure 23
5. Make sure the floor is clear of any debris.
6. Place the floor anchor bolts in the drop-in floor anchor assemblies and
hand tighten the floor anchor bolts (Figure 23).
7. After all components have been situated, continue to secure the
containment wall to the floor by tightening the floor anchor assembly bolts
using a 7/16” socket.
8. In the event that height of the liner exceeds the containment walls, trim the
liner as necessary after liner has been pushed fully into containment.
9. Install the extrusion clips over containment walls and liner (Figure 24).
Figure 24
EnviroGuard 800-206-9884 Fax 909-624-1772 www.egsintl.com
11/07 rev. A Eagle System Retrofit Installation Setup Instruction - 9 -