Page 65 - (KU)01-75GAJ-1.5 - Change 1
P. 65

INTRO


   EP'S                                                              (KU)01-75GAJ-1.5                 A     FIGURES


                                                  1.2.2 CAUTIONS                                      B
                                                                                                             ACAWS
                                    Alert/Condition                    Crew Action
                              L DSPLY DATA BUS FAIL*                                                  C     GROUND
                              Both channels of the data bus   L DISPLY DATA BUS FAIL* procedure...
                              have failed. Failure will be   ............................................ Accomplish  D
                              preceded by an MC failure.                                                    TAKEOFF
                              L DUMP VLV OPEN                                                         E
                             The left dump valve is not fully   LEFT DUMP switch............. Verify close
                             closed as sensed by the FMC.       Visually check if fuel is inadvertently     FIRE/SMK
  NORM                       If the fuselage tank contains      being dumped.                         F
                             more than approximately 1,000
                             pounds of fuel, the fuel will be   If the fuselage tank is installed and   G   PRES/OXY
                             forced through the open dump   the dump valve is veri¿ed open:
                             valve (if cabin is pressurized).   Pressurization Mode Select switch.........
                             If it contains less than       ............................................ NO PRESS  H  ENG/PROP
                             approximately 1,000 pounds
                             of fuel, cabin air will escape     Depressurize the aircraft to avoid
                             through the open dump valve.       dumping fuselage tank fuel.           I        FUEL
                                                            AR capability is lost.
                                                                                                      L
                                                            If the fuselage tank is not installed:
                                                                                                               AAR
                                                            Pressurize the cross-ship manifold.
                                                                                                     M
                                                            INTERCONNECT switch (either).... Open
  SPEC                              NOT FOR FLIGHT                                                             ELEC
                                                                Verify the dump valve position by     N
                                                                visually checking if fuel is being
                                                                dumped.                                        HYD
                                                            INTERCONNECT switch (either)... CLSD     O

                                                            If dump valve position cannot be                FLT CTRL
                                                            veri¿ed or is veri¿ed open:               P

                                                            Do not open either interconnect valves,
                                                            except to pressurize the aerial refueling   R     GEAR
                                                            manifold to dump fuel.

                                                            Do not attempt fuel crossfeed or fuel
                                                            transfer operations if either interconnect   S  DOR/RMP
  PERF                                                      valve is open.

                                                                                                      T     JETTISON


                                                                                                      U
                                                                                                            LANDING

                                                                                                      V
                                                                                                            DITCHING
                                                                                                     W
                                                                                                            BAILOUT
                                                                                                      X

  OPER                                                                                                      FAULT LG

                                                              -
                            Use, copying and/or disclosure is   151
                            governed by the statement on the
                            title page of this document.  BACK                                               CHARTS
   60   61   62   63   64   65   66   67   68   69   70