Current projects



                                                               1. CORNWALL BUSINESS PARK  offices including all infrastructure
                                                               Client: Classic Builders   works.

                                                               Brief: New Business Park in the heart   Electrical Installation:
                                                               of Cornwall near Redruth. Provision   LV distribution, lighting, small power,
                                                               of 14 new industrial units and a small   fire, CCTV, access control, security,
                                                               two-storey office block on a large site   photovoltaics.
                                                               with provision of external services and
                                                               infrastructure.            Mechanical Installation: Heating,
                                                                                          hot and cold water, ventilation, air
          SOUTH WEST                                           Scope: Provide a complete building   conditioning, above ground drainage.
                                                               services package for workshops and
         Plymouth








          “The Southwest region continues to stabilise itself
          in the area with a view to continued growth in 2019.
          Turnover has been increased from 2017 with continued
          success in the direct client market.


          There were a number of successes in 2018, and there are two projects that
          stand out to me in particular. Firstly, the delivery of Quantum heating to 184
  18      properties for Cornwall Housing. This project involved managing 184 individual   1
          tenants across the county; meeting with each one individually to plan and
          execute the work in a timely and professional manner. Additionally we tendered   2  3
          and secured a plant upgrade project at RNAS Culdrose with Amey Defence
          Services which finished off the year in a positive manner and gave us a good
          start going into 2019. This project is still ongoing and will be completed in
          May 2019.

          We continued to face commercial challenges in 2018 which included legacy
          issues and outstanding sub-contract payments, both of which effected cash and
          profit. That being said, with some good results on projects we were able to turn
          a profit at the end of 2018 despite these issues and going into 2019 with no
          legacy projects.
                                                               2. RNAS CULDROSE           3. OAK TREE SCHOOL EXTENSION
          The key challenges for 2019 will be delivering the overall budget by securing   DECENTRALISATION PHASE 1B  Client: Classic Builders
          and delivering our probable works. We must also continue to secure orders for   Client: Amey Defence Services
          Q3 2019 and beyond into 2020. Heading into 2019 the region saw 40% of           Brief: Building services installation
          turnover secured and a further 40% probable orders. This allows us to focus on   Brief: Decentralisation of site from   in school extension.
          key tenders and securing the remaining budget by way of selective tendering.   steam to gas, including replacement
          We hope to have secured our 2019 turnover by mid-2019 allowing us to focus   boiler plant and AHU plant to six   Scope: Provide new building services
          on our growth for 2020.                              existing buildings.        to Oak Tree School classroom and
                                                                                          reception extension, this includes
          New relationships have been built with Ian Williams and Classic Builders,   Scope: Safe isolation and strip   the integration of the existing school
          realising a number of main contractor projects in the last year. One in three   out of existing redundant systems,   services into the new boiler plant.
          projects have now been secured with a main contractor. We continue to look   installation of new gas mains site
          for new clients and main contractors and rebuilding relationships. The region   wide, replacement AHU and boiler   Mechanical Installation: Heating,
          has seen a notable improvement on this time last year by obtaining secured   plant including associated BMS   ventilation, BMS, domestic water
          and potential works of high value. We continue to look forward throughout   controls and fire alarm systems.  services and drainage.
          2019 with real optimism and building upon the hard work and dedication
          of the local team.’’                                 Electrical Installation – BMS, fire,   Electrical Installation: LV
                                                               and power to mechanical plant.  Distribution, Fire Alarm Security
                                                                                          Alarm, Disabled Alarms, Lighting,
          Adam Whiting                                                                    Power, Data
          Operations Manager, South West                       Mechanical Installation – Heating,
          Lorne Stewart Engineering                            H&C water, ventilation and gas main.
   15   16   17   18   19   20   21   22   23   24   25