Page 94 - JBAS Realty-Bernardon Proposal for Design Services (revised)
P. 94

Page 6
                                                                                                 May 25, 2022
                                                                                          revised July 8, 2022
               Review Requests for Information (RFIs) that relate to site work and make recommendations for action by
               the Contractor and/or Client.


               Conduct monthly site visits to observe construction progress. This scope assumes a construction duration
               of 12 months, so 12 site visits are included in this fee. Additional site visits will be an additional service.


               Complete one (1) final observation site visit once construction has been completed and provide the
               contractor with a punch list relating to the civil portion of the project.

               Based on CoreStates review of the site during the punch list site visit, as well as Contractor Supplied As-
               Built drawings, CoreStates will provide letters of concurrence to the AHJ for public improvements,
               water/wastewater service, and site permit release.



                                                   SERVICES NOT INCLUDED
               Any service not expressly stated above shall not be included in this Scope of Services. The following
               services are specifically excluded from this contract, but can be provided as an additional service at a fee
               to be agreed upon between the Client and CoreStates.

               As-Built Surveys


               Opinions of Probable Cost


               Construction Stakeout Services

               Listed Species Determination


               Phase II ESA


               Offsite Roadway Improvements


               Traffic Impact Study or Assessment


               Traffic Signal Design

               Offsite Utility Extensions


               Retaining Wall Design


               Permit and Application Fees
   89   90   91   92   93   94   95   96   97   98   99