Page 5 - Bernardon Proposal-101 Independence Lane
P. 5

www.bernardon.com















               Douglas Perry, AIA, LEED AP  will  serve  as       We will retain  Paragon Engineering Services
               Project Director collaborating closely with Paul   to  provide  the  scope  of  mechanical,  plumbing,
               relative to the tasks of organizing, executing,    electrical, and fire protection (MPEFP) engineering
               and coordinating project assignments, and at the   design services, and we have incorporated
               appropriate  time,  the  preparation  of  design  and   their fee and services in this proposal.  The fire
               construction documents.  In addition, Doug will    suppression scope of work will be described using
               serve as the communication liaison throughout      a performance-based narrative.  We understand
               the project, not only for communication with       that utilities to the site including the electrical,
               representatives  of  101  Independence  Lane       gas, water, and sewer capacities will be adequate
               Associates LLC but also in-house with all design   to support the new construction.  Civil engineering
               team members.                                      will be provided by others under direct contract
                                                                  with you.  Our design team will coordinate the
               Michael Welz, CSI, CDT will bring Bernardon’s      building’s  finished  floor  elevation,  mechanical,
               “fresh eyes review” quality assurance program      plumbing,  and  electrical  utility  ingress/egress
               and his 35+ years of experience to bear on behalf   elevations and sizes with the civil engineer.
               of 101 Independence Lane Associates LLC.   Our
               Quality Assurance Program is designed to build     We understand 101 Independence Lane Associates
               high  quality  into  the  design  and  construction   LLC will engage a General Contractor (GC) or
               documentation process and minimize the reliance    construction manager (CM).  The GC or CM will
               on last-minute error detection.                    be responsible for scheduling and coordinating all
                                                                  construction-related activities.
               The  Bernardon  team  will  be  further  supported
               by members of our 96-person design firm. This
               level of talent and depth allows us to provide the
               necessary manpower and support to complete
               this project in a timely manner.

               We  will  retain  TD&H  Engineering  to  provide
               structural engineering services, and we have
               incorporated their fee and services in this proposal.
               Documentation of the wall panel embedments and
               layout, as well as the design of the panel to support
               the erection and lifting conditions, will be provided
               by the installing contractor.  We have assumed
               that conventional spread footings are adequate
               to support the  building loads.   We  recommend
               that you engage a geotechnical consultant to
               confirm the soil bearing and underlying conditions,
               recommended foundation system, and seismic site
               coefficient prior to the structural system design.



               BERNARDON  |  Response to Request for Proposal for Design Services                          Page 2
               101 Independence Lane Associates LLC  |  August 5, 2022