64

                        The Blacksmith’s shop is equipped with both Electric and Oxy-acctylenc welding plants and
                     in conjunction with the machine shop is capable of fabricating many spare parts for vehicles
                     and machinery. This shop also repairs all metal bodywork, etc.
                        The Paint Shop is equipped with modern paint spraying equipment, and a large extractor
                     fan for removing paint fumes. Unskilled labour was trained to do this work, and a first-class
                     finish is now possible. During the coming year a large sand blasting machine is being pur­
                     chased and will be invaluable for stripping old paint and rust deposits from vehicles and
                     machinery, prior to repainting.
                        On 9th Ramadhan, 1371, the Transport Department undertook the repair and mainten­
                     ance of all P.W.D. mechanised plant and equipment. This work was formerly contracted out
                     to a local firm, and it is felt that the change-over will represent a great saving in time and money.
                        The total number of vehicles on charge at the end of the year is :—
                              (a)  Load carrying vehicles (Trucks)               40
                              (b)  Buses, Station Wagons, etc.                   12
                              (c)  Pick-ups ..                                   12
                              (d)  Saloon Cars                                   21
                              (d) Motor Cycles                                   16
                                                                                 101

                         The total number of Launches, Mechanical Plant, Machinery, etc. : 35.
                         Vehicles written off charge : Twelve vehicles were written off charge as being beyond
                     economical repair.
                         The total number of new vehicles ordered was 28.
                         The total number of new vehicles received was 31.
                         The number of service operations carried out on vehicles during the year was 2,500.
                         The total number of repair jobs, both major and minor, carried out on vehicles, machinery,
                      etc., was approximately 2,000.
                         The whole of the Transport Department is now completely re-organised and is probably
                      the most up-to-date of its kind in Bahrain. It is capable of undertaking any repair work that
                     it may be called upon to do in the future.
   467   468   469   470   471   472   473   474   475   476   477