Page 32 - UL_Report On_Part 1
P. 32

25 IITGN-UL/Façade                                                                                                                                                           26 IITGN-UL/Façade






          f. Fire fighting                                                               Single swing steel stiffened doors of 16 gauge galvanized steel incorporating                 Curtain wall Insulation:                                                                                2B                             2G
                                                                                         single point latches are installed. Thickness of door is 46mm (1-3/4”). Steel                                                                                                                2D
          The  test facility is provided with an external hydrant system.                stiffened  doors  are  known for  their  rigidity and  are available in varying               a. Forming material                                                                                                                    2I
          Underground mains are laid 1m below the ground level. Hydrant stand            strength and quality. Spacing between stiffeners is about 4” and are welded to
          post (single) with nominal pipe size 75mm made of mild steel and               each other at the top and bottom and to the inside door skin. The cavities are                Nominal density 4 pcf (pounds per cubic feet) (64 kg/m3) mineral wool is used for           2E                                         2H   3B
          having 80mm flanged inlet and outlet (ANSI B 16.5 150# or other),              filled with special core. In the test, cavities in the doors used are filled with             batt insulation. Bat sections are cut to a minimum 4½ inch width and stacked to a
          mouthed with standard 63mm size hydrant valve is installed at a                mineral Rockwool (4-pcf).                                                                     thickness which is minimum 20% greater than the width of linear gap between the             2C                                                  1
          distance of 3m from the face of the building.                                  Door leafs are provided with vision panels for visibility.  These doors are                   curtain wall insulation and edge of the concrete floor slab. The forming material is
          Fire brigade inlet having gunmetal body with  three gunmetal male              provided with glass panels of size 100 sq. in.                                                compressed and inserted cut-edge first into linear gap such that its top surface is         2F
          instantaneous inlets of size 63mm (with NRV) and 100mm size flanged                                                                                                          flushed with the top surface of the floor assembly. A maximum of one tightly butted
          outlet are connected  to dry riser piping. Fire brigade inlet body is          h. Fire stop                                                                                  seam is permitted between mullions.                                                           3A
          provided with drain valve.                                                                                                                                                   Excellent thermal performance: RSI value of 0.7 per 25mm of thickness
          Internal hydrants are provided inside the building near the exit staircase     A gap is always provided between  the cladding and  the deck slab of  the                     Durable and Inorganic: Does not support growth of fungi, nor does it sustain vermin
          area at each floor. One hose reel arrangement is provided at every             building to avoid crashing of glass in case of unwanted vibrations and also to                Quick installation: Convenient job site fabrication
          internal hydrant location.                                                     mitigate effects of thermal expansion. This gap is about 150mm and in each
          Galvanized iron pipes conforming to IS: 1239 are used for hydrant system.      test needs to be filled with a suitable fire stop material. In case of fire event, the        b. Fill material
          Pipes were painted with a coat of primer and  two coats of synthetic           performance of the façade as well as of the fire stop material is crucial for the                                                                                                       2C
          enamel  paint  are  applied  for  above  ground  piping  whereas  for          overall performance of the building. Fire stop material should have sufficient                Minimum 1/8 inch  thickness of fill material spray is applied over  top of forming
          underground piping coating and wrapping are done as per IS standards.          fire rating to prevent fire from spreading internally.                                        material and lapping of minimum ½ inch onto  the  top surface of  the floor and           2F
                                                                                         Tests 1, 2 and 3 utilizes UL rated glasswool as fire stop material whereas test 4             curtain wall insulation and framing covers.
          g. Fire doors                                                                  utilizes normal fire stop material provided in form of plywood sheets which                                                                                                             2F
                                                                                         results in internal fire spread due  to premature failure of fire stop material
          1.5 hour UL rated fire doors are used between  the compartments  to            before glass breakage. 1.5 hour rated fire stop material is used at each floor level
          prevent propagation of fire and smoke from one compartment  to                 for tests 1, 2 and 3.                                                                                                                                                                                                           2A                1
          another at same level during a test.

                                                                                                                                                                                                                                                                                                                  2B



                                                                                                                                                                                                                                                                                             Figure 14: Typical curtain wall insulation