Page 39 - UL_Report On_Part 1
P. 39

29 IITGN-UL/Façade  30 IITGN-UL/Façade




                                                                                                 21 # R 6 4                                         21 # R 6 5

                                                                                                             21 # R 6 8
 Ground floor level was instrumented with 11   Figure 16 and Figure 17 show  the locations of  the   B                                      21 # R 5
 thermocouples and one thermocouple tree placed at the   thermocouples at first and second floor levels. Four   21 # T R4            21 # T L4         D
 center of the partition wall to measure the temperature   thermocouples were placed at four roof corners of the   Thermocouple
                                                                                                                tree
 profile of  the compartment. Figure 15 shows  the   compartment, whereas  TC 68 was placed near  the                                21 # T L3
 locations  of  the  thermocouples  within  the  beam beneath  the cement board at first floor level.   21 # T R3
 compartment along with  thermocouple  tree. ABCD   Two thermocouple trees were placed at two ends of
 marks the façade face being tested of compartment 1 at   1 1 # R 2 3  11 # T 4  11 # R 3 1  the façade face being tested. Second floor comprises of   3 m   21 # T R2  21 # T L2
 ground floor level. Nomenclature for  thermocouples   11 # R 3 4  four  thermocouples at four roof corners without
 was kept consistent throughout the test. A label ‘11 # B   B  1 1 # R 2 2  1 1 # T 3  11 # R 3 0  thermocouple  trees being placed at  this level.   21 # T R1  21 # T L1
 17’ identifies with the first number ‘1’ corresponding to   D  Thermocouples were not provided at base on first and                                         3.84 m
 the floor level, second number ‘1’ corresponds  to  the   Thermocouple   second floor due to less temperature change occurring   A                   C
 compartment at  the respective floor level. ‘#’ denotes   11 # T 2  tree  through composite deck slab and effective fire stop   6 m
 thermocouple while alphabet ‘B’ or ‘R’ represents ‘Base’   material placed between cladding and the deck slab.
 or ‘Roof’ level within a compartment and the number   3 m  11 # T 1            Figure 16: Layout showing location of thermocouples at first floor level for Test 1
 next to the  alphabets  indicates the thermocouple
 number. Eight  thermocouples were placed at eight   1 1 # B 2  11 # B 1 7  11 # B 10              3 1 # R 8 3                                        3 1 # R 9 1
 corners of the room whereas thermocouples 16 and 17
 were placed at intermediate base length  to provide   3.84 m
 better  temperature variation along  the length of  the   1 1 # B 1  11 # B 1 6  11 # B 9  B  3 1 # R 8 4                                   3 1 # R 9 0
 compartment. Thermocouple 34 was placed near  the   A  6 m  C                                                                                          C
 steel beam  that was protected with cement board  to
 measure the temperature profile near the beam and the
 effectiveness of  the cement board in providing fire   Figure 15: Layout showing location of thermocouples at ground floor level for Test 1
 protection to the beams.                                                   3 m





                                                                                                                                                              3.84 m

                                                                                A
                                                                                                                  6 m                                  D
                                                                                  Figure 17: Layout showing location of thermocouples at second level for Test 1
   34   35   36   37   38   39   40   41   42   43   44