Page 54 - Property Sustainability Report 2015
P. 54

Property Objectives and Targets (2013/14, 2014/15) Objective
Status
Data ownership completed
Included in overall Training Budget
Total construction waste recycling rate is 64.63%
A more comprehensive framework for whole construction project is under preparation
Ongoing
Acquired
Project did not proceed Adopted
Project in place
Adopted Completed
Completed
On track Completed
On track On track
On track Adopted
Completed Completed
Completed
Building Sustainable Strategy
Our Focus
Our Environment
1. Review the building sustainability data collection process, assign data ownership and develop the necessary centralized data management system for future reporting
2. Allocate departmental training fund speci c to building environmental and sustainability programmes
3. Establish the target percentage of recycling the construction waste for different materials/ types of projects
4. Develop sustainable development guideline for applying sustainable building and interior  tting-out materials
5. Continue to improve the Property Environmental Management System
1. Pursue LEED and BEAM Plus (Gold rating) certi cation for SCTC project
2. Pursue BEAM Plus (Gold rating) certi cation for KSC Golf Academy project
3. Optimise building life cycle cost modelling to extend its use to other Property projects and operations
Energy Ef ciency & Renewable Energy
1. Save 15% of annual energy consumption at STCC by implementing water-cooled air conditioning and various energy-saving measures
2. Extend the use of LED lightings in various premises
3. Carry out Club-wide energy audits and implement energy saving measures as far as practicable
4. Study and apply solar water heating system in various Property premises Material Use
1. Set out roadmap for replacing existing freezers and refrigerators with those using environmentally friendly refrigerants
2. Use wood (90% recycled wood) for decking and sitting benches at staff quarters open areas Operational Waste Management
1. Continue the collection of waste paper, plastic and metal for recycling
2. Continue the collection of spent  uorescent tubes and printer toners for proper disposal Indoor Environmental Quality
1. Continue the annual IAQ survey and certi cation for corporate buildings
2. Ensure 80% of products and materials (e.g. paints) used in the future renovation projects are free of volatile organic compounds (VOCs) or low chemical-emitting
Emission Control and Mitigation
1. Undertake the tracklight improvement project at both HVRC and STRC
2. Improve wastewater drainage system for the collection of wastewater at Horse Boxes Carpark in Sha Tin
Water Conservation
1. Install water ef cient  xtures in toilets and kitchens
54