Cornell University

                                           The Bloomberg Center, Roosevelt Island, NY



































          SIZE                     CONTRACT TYPE           REFERENCE
          150,000 square feet      Construction Manager-at-Risk  Diana Allegretti,Assistant
                                                           Director Design and
          SCHEDULE                 OWNER                   Construction
          28 months                Cornell University      646.632.4985
          COMPLETION DATE                                  ARCHITECT
          2017                                             Morphosis Architects




                                                                      PROJECT DETAILS
         The Bloomberg Center is the first of several buildings to be       •   Th  e Bloomberg Center is located on the 12 acre
         constructed of the new Cornell NYC Tech Campus on Roosevelt       Roosevelt Island Campus.
         Island.  Th  e Bloomberg Center provides graduate students, faculty
                                                                         •   Th  e building is a new four story, 150,000 SF
         and administrators with a new facility for research and education.  Th e
                                                                           facility.
         building design refl ects Cornell’s goals of creativity and excellence,
         providing fl exible academic spaces and pioneering new standards in       •   Th  e structure will be constructed of steel and
         building performances and sustainability.                         concrete.
                                                                         •   Th  e façade will be a unitized system of metal
                                                                           panels, windows and curtainwall.
                                                                         •   Th  e building will be heated and cooled by a
                                                                           closed loop geothermal system.
                                                                         •   Th  e roof is covered with approximately 40,000
                                                                           SF of photovoltaic panels.
                                                                         •   Th  e project is LEED Platinum and net zero
                                                                           energy usage.