Institute for Advanced Study
Systems Biology Addition, Princeton, NJ
SIZE SCHEDULE CONTRACT TYPE
13,000 square feet 16 months Construction Manager-at-Risk
CONSTRUCTION COST COMPLETION DATE OWNER
$7.8 million 2008 Institute for Advanced Study
PROJECT DETAILS
Th e selective demolition to the façade of the existing Bloomberg Hall • Extensive sitework included limestone and
was followed by the construction of a new and connected three-story bukstone walkways, a stone veneer retaining
foot Systems Biology addition. Th e façade consists of a terra cotta wall and an outdoor garden rock sculpture by
paneling system accented with custom aluminum shaped trim and Richard Long from Bristol, England.
panels. Th e interior includes a three-story atrium with an ornamental
• Th e atrium is paneled with custom ash millwork
stair encased with wood and stone treads.
and cabinets.
UNIQUE PROJECT CHALLENGES AND SOLUTIONS
Th e Institute for Advanced Studies project presented a challenge of
requiring noise restrictions on campus during construction. With the
entire campus being a “Th ink Tank”, residential housing adjacent to the
project and the project being connected to other buildings it is easy to
see why Barr & Barr had to use it’s extensive knowledge to solve this
challenge. Logistics Planning was a key factor for this project. Th e use
of careful staging and working closely with the owner was an integral
part to solving these issues.