Greenfi eld Community College

                                              Core Modernization, Greenfi eld, MA



































         SIZE                     SCHEDULE                 CONTRACT TYPE
         89,000 square feet       20 months                Construction Manager-at-Risk
         CONSTRUCTION COST        COMPLETION DATE          OWNER
         $25.2 million            2011                     Greenfi eld Community College
                                                           (DCAMM Project)







                                                                      PROJECT DETAILS
        Th  e renovated and expanded Student Center contains student service   •  Massachusetts Division of Capital Asset
                                                                          Management & Maintenance (DCAMM)
        functions, a repositioned large-volume library/learning commons,   funded project.
        academic support space and a cafeteria which serves as a college meeting   •  Building Information Modeling (BIM)
        space. Th  e transformed grounds include a new quadrangle capable of   utilized for modeling of existing basement,
                                                                          mechanical coordination and clash detection as
        hosting large, outdoor functions, clearer connections between facilities
                                                                          part of the constructability review.
        with improved accessibility.
                                                                         •  A high standard of sustainability was met
                                                                          through the use of  geothermal climate control,
        UNIQUE PROJECT CHALLENGES AND SOLUTIONS                           recycled and locally extracted and manufactured
        Th e Greenfi eld Community College project involved multiple major   materials, low-VOC building products, low-
                                                                          fl ow fi xtures and water-effi  cient landscaping.
        construction aspects to occurr simultaneously: heavy demolition and   Certifi ed LEED Gold.
        renovation of existing spaces; a new three story addition above the
                                                                         •  Extensive abatement and demolition work
        active loading; complete transformation to 5-acres of landscaping and   enabling the signifi cant reprogramming
        hardscaping to allow accessibility to the buildings; and installation of a   renovation.
        new geothermal well fi eld.  One of these activities occurring alone on a   •  Multiple separate additions including an entry
                                                                          addition, a library/dining commons addition and
        small central campus would have required extensive logistics planning,
                                                                          corridor additions that connected the existing
        yet Barr & Barr was tasked with managing them all simultaneously.  By   buildings to the new central core.
        spearheading the logistics planning early in preconstruction, and working   •  Substantial upgrades to the existing physical
        tirelessly with the facilities staff , Barr & Barr commanded absolute safety   plant including new air handling units and
                                                                          campus wide replacement of the digital controls
        and access for students, faculty and staff  during construction.  systems.