Richard Lent
                                                   NY Chief Estimator


      EDUCATION                                                               PALLANTE ARCHITECTS
      University of Oregon                                                    Joseph Pallante/Senior Principal
      B.S. Construction Management                                            973.4949001
                                                                              jjp@pallantedesign.com
      YEARS OF EXPERIENCE
      36                                                                      CORNELL NYC TECH
                                                                              Diana Allegretti/AD Design & Construction
      YEARS WITH BARR & BARR                                                  646.632.4985
      31
                                                                              dla83@cornell.edu

                                                                              ST. JOSEPH’S MEDICAL CENTER
                                                                              Michael J. Spicer/President & CEO
                                                                              914.378.7485
                                                                              michael.spicer@saintjosephs.org




     Dick has 36 years in the industry working solely in the New York market. He has developed a keen sense of cost and what
     things take to get completed. He will work with the project team to fullfi ll all planning and preconstruction requirements in
     order to facilitate a plan that will allow ample decision-making without aff ecting the overall schedule.



     SIMILAR PROJECTS
     Cornell NYC Tech, Roosevelt Island, NY                 Mount Saint Mary College, Newburg, NY
     The Bloomberg Center                                   Aquinas Hall Math Science and Technology Center Addition
     150,000 SF. Th  e Bloomberg Center is the fi rst of several buildings to  52,000 SF. Th  e three-story addition to the existing Aquinas Hall
     be constructed of the new Cornell NYC Tech Campus on Roosevelt  includes offi  ces, conference rooms, classrooms and laboratories to
     Island.  Th  e Bloomberg Center provides graduate students, faculty  be used for science and computer studies. A new three-story atrium
     and administrators with a new facility for research and education.  Th e  at the main entrance provides a gathering space for students and a
     building design refl ects Cornell’s goals of creativity and excellence,  new entrance lobby to the theatre/ auditorium.
     providing fl exible academic spaces and pioneering new standards
     in building performances and sustainability.           Morristown-Beard School, Morristown, NJ
                                                            Math and Science Building
     Cornell University Medical Center, New York, NY        25,845 SF. Th  e new building is a (2) story steel frame and concrete
     Lasdon Biomedical Research Center                      construction with a partial basement which will include a two story
     104,000 SF. Consisted of building new state-of-the-art research  lobby and state of the art classrooms for math and science labs.  Th e
     facility between, next to, over and under a functioning medical  new classrooms will be roughly twice as large as before and provide
     complex without interruption to ongoing experimental research  more fl exibility to allow for both individual and group work, with
     and patient treatment.                                 better lighting and better access to technology.

     New York School for the Deaf, White Plains, NY
     New Auditorium/Library and Renovations to Classrooms
     80,000 SF. Th  e New York School for the Deaf undertook a major
     modernization program which consisted of a new auditorium/library
     along with renovations to existing classrooms. Both Peet Hall and
     Ford Hall had new entrances built onto the lower level providing
     better access for both the general public and handicapped. New
     elevators were also installed in both Halls.
     Rockefeller University,New York, NY
     Research Building, 10th, 11 and 12th Floors
     37,000 SF. Th  e scope of the construction was to fi t out 3 fl oors of
     an existing 12 story building.  In addition, the infrastructure of the
     HVAC system was upgraded for the entire building.  All phases of
     work had to be coordinated to minimize any impact to the other
     functioning laboratories and their sensitive experiments.