Page 34 - Barr&Barr_Technical Proposal
P. 34

Keith Stanisce
                                                       Offi  cer In Charge


         EDUCATION
         West Virginia University
         BS Civil Engineering
         American Society for Healthcare
         Engineering (ASHE)
         Construction Certifi cate

         YEARS OF EXPERIENCE
         34
         YEARS WITH BARR & BARR
         34







        A graduate civil engineer with extensive experience in higher education and the healthcare industry.  Keith, in his 34
        years of experience, has obtained the trust and confidence of owners, architects and subcontractors.  Providing him the
        opportunity to work hand–in-hand with some of todays leading Institutions and signature architects.  His leadership,
        integrity and knowledge has promoted him to the position of President and CEO of Barr & Barr.



        SIMILAR PROJECTS
        Cornell NYC Tech, The Bloomberg Center,                Princeton University, 20 Washington Road,
        Roosevelt Island, NY                                   Princeton, NJ
        150,000 SF. Th  e Bloomberg Center is the fi rst of several buildings to  200,000 SF. Renovations to 20 Washington Road, built in 1929,
        be constructed of the new Cornell NYC Tech Campus on Roosevelt  will provide a home for the Department of Economics, several
        Island.  Th  e Bloomberg Center provides graduate students, faculty  international offi  ces and the Princeton Institute for International and
        and administrators with a new facility for research and education.  Th e  Regional Studies (PIIRS). Th  e structure’s interior will be renovated
        building design refl ects Cornell’s goals of creativity and excellence,  extensively and feature new classroom, offi  ce and meeting space,
        providing fl exible academic spaces and pioneering new standards  communal spaces and two atriums. Th  e historic character of the
        in building performances and sustainability.           exterior of the building will be preserved.
        Dollar Value: $130 Million                             Dollar Value: $118 Million
        Start Date: December 2014                              Start Date: January 2014
        Completion Date: May 2017                              Completion Date: December 2016
        Rutgers University, Chemistry and Chemical Biology Building,   Princeton University, Icahn Laboratory,
        New Brunswick,NJ                                       Princeton, NJ
        145,000 SF. Th  is new four story  (above grade) Chemistry and   100,000 SF. Th  e Carl Icahn Laboratory provides a venue for pioneering
        Chemical Biology, with a basement and penthouse, will house   genetic research. Construction included four modular research
        classrooms, administration offi  ces, research laboratories and a 120   laboratories designed in a “loft” confi guration to easily adapt with
        seat auditorium.  Th  e lobby doubles as a presentation and gathering   changes in research and technology over time, an animal facility,
        space and the  basement includes specialty imaging facilities.   conference rooms, auditoriums and a central glass walled atrium that
                                                               features a cafe, seating areas, a lecture theatre and a Frank Gehry
        Dollar Value: $103 Million                             sculpture/meeting room.
        Start Date: June 2014
        Completion Date: September 2017                        Dollar Value: $48 Million
                                                               Start Date: March 2001
        Princeton University, Peretsman-Scully Hall & Princeton   Completion Date: October 2002
        Neuroscience Institute, Princeton, NJ
        249,000 SF, LEED Silver. Th  e state-of-the-art two-building complex
        houses the Peretsman-Scully Hall & Princeton Neuroscience
        Institute and the Department of Psychology. Th  e research facilities
        will feature teaching classrooms, meeting rooms, faculty offi  ces,
        laboratories and instructional space. Th  e lower level will incorporate
        a lecture hall and MRIs.

        Dollar Value: $199 Million
        Start Date: June 2010
        Completion Date: August 2014
   29   30   31   32   33   34   35   36   37   38   39