Peter Santorufo

                                                   Core/Shell Superintendent


         LICENSES
         Certifi cate of Training - Steel Erection
         Certifi cate of Training - Suspended Scaff old
         Safety
         OSHA - 10 hour Safety Certifi cate

         OSHA - 40 hour Safety Training
         NYS Department of Environmental
         Conservation- Erosion and Sediment Control
         Certifi cate
         YEARS WITH BARR & BARR
         15



        First in and last out the door: Peter is a leader in commitment.  Having earned his stripes as a master carpenter he is respected
        by his peers for his extreme attention to detail.  His deep focus on construction details is another benefit to owners,
        architects, and subcontractors alike. Subcontractors in particular appreciate his skillful, logical organization of the work flow
        to maximize productivity.


        SIMILAR PROJECTS
        Cornell NYC Tech, The Bloomberg Center,                Hudson Valley Hospital Center, Medical Offi  ce Building,
        Roosevelt Island, NY                                   Cortlandt Manor, NY
        150,000 SF. Th  e Bloomberg Center is the fi rst of several buildings to   55,000 SF. new 3-story offi  ce building was constructed on the Hudson
        be constructed of the new Cornell NYC Tech Campus on Roosevelt   Valley Hospital Center Campus with a connecting corridor on the
        Island.  Th  e Bloomberg Center provides graduate students, faculty  1st fl oor to the Main Hospital Facility.  Th  e Ground Floor program
        and administrators with a new facility for research and education.  Th e  was a new state-of-the-art Cancer Center operated by Hudson
        building design refl ects Cornell’s goals of creativity and excellence,  Valley Hospital Center.  Th  e 2nd and 3rd fl oors were designed and
        providing fl exible academic spaces and pioneering new standards  constructed as future tenant shell spaces with the anticipation  of
        in building performances and sustainability.           accommodating four independent tenants on each fl oor
        Dollar Value: $130 Million                             Dollar Value: $11 Million
        Start Date: December 2014                              Start Date: August 2010
        Completion Date: May 2017                              Completion Date: August 2011
        Bayer Healthcare, New Headquarters,                    The Apollo Theater,
        Hanover Township, NJ                                   New York, NY
        675,000 SF, Gold. Th  e new U. S. Headquarters for Bayer Healthcare  64,000 S. In the initial phases, work focused on the restoration
        was constructed in two phases. Th e fi rst linked two existing offi  ce  of the historic 125th street terra cotta facade, marquee, and blade
        structures with a fi ve-story glass atrium. In addition to these Class  sign; the restoration of the original cornice; the installation of a
        A offi  ce buildings, one of the existing research buildings was  new roof; and the addition of a new storefront, entrance doors, and
        rejuvenated as a fi tness center.                      box offi  ce facilities. Th  e next phase focused on the Harvey Th eater,
                                                               including updates to the interior fi nishes; the addition of new seating;
        Dollar Value: $75 Million                              enhancements to backstage support elements; and the integration
        Start Date: June 2012                                  of new building and life safety systems.
        Completion Date: June 2013 (Parking Garage) & September 2013
                                                               Dollar Value: $23 Million
        Orchestra of St. Luke’s,                               Start Date: April 2004
        New York, NY                                           Completion Date: December 2007
        20,000 SF, LEED CI-Platinum. Th  e DiMenna Center boasts a
        large orchestra rehearsal hall, a chamber orchestra rehearsal hall, a
        chamber ensemble room, a green room, two artist studios, a learning
        and media center, a musician’s lounge and café, a music library, a
        resource center, instrument storage facilities and offi  ces on a high
        fl oor with lots of light, lobby and lounge areas.
        Dollar Value: $9 Million
        Start Date: March 2010
        Completion Date: September 2011