Page 37 - Barr&Barr_Technical Proposal
P. 37
Peter Santorufo
Core/Shell Superintendent
LICENSES
Certifi cate of Training - Steel Erection
Certifi cate of Training - Suspended Scaff old
Safety
OSHA - 10 hour Safety Certifi cate
OSHA - 40 hour Safety Training
NYS Department of Environmental
Conservation- Erosion and Sediment Control
Certifi cate
YEARS WITH BARR & BARR
15
First in and last out the door: Peter is a leader in commitment. Having earned his stripes as a master carpenter he is respected
by his peers for his extreme attention to detail. His deep focus on construction details is another benefit to owners,
architects, and subcontractors alike. Subcontractors in particular appreciate his skillful, logical organization of the work flow
to maximize productivity.
SIMILAR PROJECTS
Cornell NYC Tech, The Bloomberg Center, Hudson Valley Hospital Center, Medical Offi ce Building,
Roosevelt Island, NY Cortlandt Manor, NY
150,000 SF. Th e Bloomberg Center is the fi rst of several buildings to 55,000 SF. new 3-story offi ce building was constructed on the Hudson
be constructed of the new Cornell NYC Tech Campus on Roosevelt Valley Hospital Center Campus with a connecting corridor on the
Island. Th e Bloomberg Center provides graduate students, faculty 1st fl oor to the Main Hospital Facility. Th e Ground Floor program
and administrators with a new facility for research and education. Th e was a new state-of-the-art Cancer Center operated by Hudson
building design refl ects Cornell’s goals of creativity and excellence, Valley Hospital Center. Th e 2nd and 3rd fl oors were designed and
providing fl exible academic spaces and pioneering new standards constructed as future tenant shell spaces with the anticipation of
in building performances and sustainability. accommodating four independent tenants on each fl oor
Dollar Value: $130 Million Dollar Value: $11 Million
Start Date: December 2014 Start Date: August 2010
Completion Date: May 2017 Completion Date: August 2011
Bayer Healthcare, New Headquarters, The Apollo Theater,
Hanover Township, NJ New York, NY
675,000 SF, Gold. Th e new U. S. Headquarters for Bayer Healthcare 64,000 S. In the initial phases, work focused on the restoration
was constructed in two phases. Th e fi rst linked two existing offi ce of the historic 125th street terra cotta facade, marquee, and blade
structures with a fi ve-story glass atrium. In addition to these Class sign; the restoration of the original cornice; the installation of a
A offi ce buildings, one of the existing research buildings was new roof; and the addition of a new storefront, entrance doors, and
rejuvenated as a fi tness center. box offi ce facilities. Th e next phase focused on the Harvey Th eater,
including updates to the interior fi nishes; the addition of new seating;
Dollar Value: $75 Million enhancements to backstage support elements; and the integration
Start Date: June 2012 of new building and life safety systems.
Completion Date: June 2013 (Parking Garage) & September 2013
Dollar Value: $23 Million
Orchestra of St. Luke’s, Start Date: April 2004
New York, NY Completion Date: December 2007
20,000 SF, LEED CI-Platinum. Th e DiMenna Center boasts a
large orchestra rehearsal hall, a chamber orchestra rehearsal hall, a
chamber ensemble room, a green room, two artist studios, a learning
and media center, a musician’s lounge and café, a music library, a
resource center, instrument storage facilities and offi ces on a high
fl oor with lots of light, lobby and lounge areas.
Dollar Value: $9 Million
Start Date: March 2010
Completion Date: September 2011