Page 11 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 11

Brooke A. Rodgers

                                                        Project Manager


         EDUCATION
         Rutgers University, College of
         Engineering
         BS Mechanical Engineering

         New Jersey Engineer-in-Training
         Certifi cate #10769

         YEARS OF EXPERIENCE
         27









        Brooke takes his position very seriously, knowing that he is responsible for both representing Barr & Barr and getting the best possible
        result for you as the owner. He never forgets who he is building for. You will be welcome to approach him at any time, for any reason,
        from start to fi nish. And when you do, his commitment to your best interests will be apparent. Brooke is also known as a stickler for a
        neat, orderly building site - which is appreciated by workers and visitors alike.

        SIMILAR PROJECTS

        Princeton University- Princeton, NJ                     Rutgers University - Piscataway, NJ
        Roof Top Chillers & Back Up Generators                  New Chemistry and Chemical Biology Building
        Peretsman-Scully Hall & Princeton Neuroscience Institute is a new  Th  is is a new four story  (above grade) Chemistry and Chemical
        two-building complex that houses a state-of-the-art data center,  Biology with a basement and penthouse. Th  e new building will house
        research facilities, teaching classrooms, faculty offi  ces, wet and dry  classrooms, administration offi  ces, research laboratories and a 120
        laboratories,  a lecture hall, vivarium, and MRI’s and RF shielded  seat auditorium.  Th  e lobby doubles as a presentation and gathering
        rooms.  Th  is new 249,000 SF building included rooftop chillers  space and the  basement includes specialty imaging facilities.
        and backup generators.
                                                                Schering Plough -  Kenilworth, NJ
        Princeton University - Princeton, NJ                    K-15 Drug Discovery Facility
        Offi  ce of Design & Construction,
                                                                Th  is new research facility included an interior fi t-out of multiple
        Renovations to 20 Washington Road, built in 1929, will provide
                                                                labs, offi  ces and meeting spaces.  Th  is project included a $35 million
        a home for the Department of Economics, several international
                                                                mechanical contract value, Brooke was a member of the design team
        offi  ces and the Princeton Institute for International and Regional
                                                                tasked with developing the construction coordination documents
        Studies (PIIRS). Th  e structure’s interior will be renovated extensively
                                                                utilized to build this facility.
        and feature new classroom, offi  ce and meeting space, communal
        spaces and two atriums. Th  e historic character of the exterior of  International Center for Public Health – Newark, NJ
                                                                BSL3 labs
        the building will be preserved.
                                                                Th  is was a new BioSafety Level 3 laboratory facility with an interior
        Capital Health System - Trenton, NJ                     fi t-out.  Brooke was responsible for procurement, engineering, project
        HVAC Upgrades
                                                                delivery, client satisfaction and mentoring and oversight of the fi eld
        Th  is 107,000 SF project consisted of new construction and  renovated
                                                                personnel. Th  is was a highly complex project that involved extensive
        area’s.  Work was performed while the hospital stayed operational.
                                                                trade sequencing due to the nature of the laboratory environment
        Scope of work included renovations to: Sleep Labs,  Data Center,
                                                                and an aggressive schedule.
        Pediatrics, Neonatal ICU as well as a new 12 Bed Medica/Surgical
        Unit.  In order for this facility to support all the increased areas  Cervalis Data Center –  Totowa, NJ
        there was a 17,550 SF upgrade to the HVAC system including new:  Data Center Renovation
        15K Switch Gear, 5Kv Outdoor Substation, Generator and Chiller.   Brooke was the Operations Manager for this interior mechanical
                                                                project.  He was responsible for project delivery, performance of the
                                                                fi eld operations staff , development and oversight of the preconstruction
                                                                process including innovative prefabrication delivery methods.
   6   7   8   9   10   11   12   13   14   15   16