Page 9 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 9
Glenn W. Kiefer
Offi cer in Charge
EDUCATION
Stevens Institute of Technology
BS Engineering
American Society for Healthcare
(ASHE) Construction Certifi cate
YEARS OF EXPERIENCE
45
As a mechanical engineer graduate, Glenn has spent his entire professional career in the construction industry. Glenn, in his
45 years of experience, has obtained the trust and confi dence of owners, architects and subcontractors, providing him the
opportunity to work hand–in-hand with the team to produce some of today’s most successful projects.
SIMILAR PROJECTS
Trinitas Hospital - Elizabeth, NJ Crum & Forster - Morristown, NJ
4th Floor Oncology Care Center
Headquarters
Located in the heart of downtown Elizabeth the project includes
Th is project includes the complete interior gut and renovation of the
the operational headquarters & dispatch center for the Mobile
existing four story building which will be transformed into a Class
Intensive Care Emergency Response units for Trinitas Regional
A Headquarters for Crum & Forster. In addition to the interior
Medical Center, as well as the Community Education Center
renovation the exterior of the building will receive a new skin and a
and offi ces of the Trinitas Foundation. Th e facility is a 2 story
new 515 space parking structure will be built concurrently.
steel & concrete structure located on a 2 acre site previously
occupied by retail stores and an offi ce warehouse all on the Bayer Healthcare - Hanover Township, NJ
banks of the Elizabeth River. U.S. Corporate Headquarters
Th e new U. S. Headquarters for Bayer Healthcare was constructed
Trinitas Hospital - Elizabeth, NJ in two phases. Th e fi rst linked two existing offi ce structures with a
Intravenour Pharmacy HVAC Renovation fi ve-story glass atrium. Each of the structures was renovated; one
with a two-story vertical addition. In addition to these Class A offi ce
Trinitas Hospital - Elizabeth, NJ
buildings, one of the existing research buildings was rejuvenated as
Emergency Department
a fi tness center. As part of this phase, approximately 2,500 on-grade
parking spaces was constructed within parking fi elds surrounding
St. Bartholomew’s Church - New York, NY
HVAC Upgrade the buildings.
Th is restoration project for the Church involved the repair and
MetLife - Hanover Township, NJ
consolidation of the 168 multi-colored marble and stone columns New Headquarters
located in the upper gallery around the principle elevations. Th is four story offi ce building was constructed on an 11 acre site
Severely eroded and spalled marble was selectively cut out, pinned adjacent to our completed Bayer Pharmaceuticals Headquarters
for structural soundness and rebuilt in place with marble patching facility. Th is new Headquarters for MetLife Investments includes
materials. We replaced columns with marble matching the original offi ce space, open collaborative work spaces, conference rooms, a
characteristics. All 168 columns were cleaned, polished and coated full serving kitchen and cafeteria.
with a water repellent.