Page 9 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 9

Glenn W. Kiefer
                                                         Offi  cer in Charge


           EDUCATION
           Stevens Institute of Technology
           BS Engineering
           American Society for Healthcare
           (ASHE) Construction Certifi cate
           YEARS OF EXPERIENCE
           45












          As a mechanical engineer graduate, Glenn has spent his entire professional career in the construction industry. Glenn, in his
          45 years of experience, has obtained the trust and confi dence of owners, architects and subcontractors, providing him the
          opportunity to work hand–in-hand with the team to produce some of today’s most successful projects.



          SIMILAR PROJECTS
          Trinitas Hospital - Elizabeth, NJ                      Crum & Forster - Morristown, NJ
          4th Floor Oncology Care Center
                                                                 Headquarters
          Located in the heart of downtown Elizabeth the project includes
                                                                 Th  is project includes the complete interior gut and renovation of the
          the operational headquarters & dispatch center for the Mobile
                                                                 existing four story building which will be transformed into a Class
          Intensive Care Emergency Response units for Trinitas Regional
                                                                 A Headquarters for Crum & Forster.  In addition to the interior
          Medical Center, as well as the Community Education Center
                                                                 renovation the exterior of the building will receive a new skin and a
          and offi  ces of the Trinitas Foundation. Th  e facility is a 2 story
                                                                 new 515 space parking structure will be built concurrently.
          steel & concrete structure located on a 2 acre site previously
          occupied by  retail stores and an offi  ce warehouse all on the   Bayer Healthcare -  Hanover Township, NJ
          banks of the Elizabeth River.                          U.S. Corporate Headquarters
                                                                 Th  e new U. S. Headquarters for Bayer Healthcare was constructed
          Trinitas Hospital - Elizabeth, NJ                      in two phases. Th e fi rst linked two existing offi  ce structures with a
          Intravenour Pharmacy HVAC Renovation                   fi ve-story glass atrium. Each of the structures was renovated; one
                                                                 with a two-story vertical addition. In addition to these Class A offi  ce
          Trinitas Hospital - Elizabeth, NJ
                                                                 buildings, one of the existing research buildings was rejuvenated as
          Emergency Department
                                                                 a fi tness center. As part of this phase, approximately 2,500 on-grade
                                                                 parking spaces was constructed within parking fi elds surrounding
          St. Bartholomew’s Church - New York, NY
          HVAC Upgrade                                           the buildings.
          Th  is restoration project for the Church involved the repair and
                                                                 MetLife - Hanover Township, NJ
          consolidation of the 168 multi-colored marble and stone columns   New Headquarters
          located in the upper gallery around the principle elevations.    Th  is four story offi  ce building was constructed on an 11 acre site
          Severely eroded and spalled marble was selectively cut out, pinned   adjacent to our completed Bayer Pharmaceuticals Headquarters
          for structural soundness and rebuilt in place with marble patching   facility.  Th  is new Headquarters for MetLife Investments includes
          materials.  We replaced columns with marble matching the original   offi  ce space, open collaborative work spaces, conference rooms, a
          characteristics.  All 168 columns were cleaned, polished and coated   full serving kitchen and cafeteria.
          with a water repellent.
   4   5   6   7   8   9   10   11   12   13   14