Robert Goslin

                                                        BIM / Logistics


         EDUCATION
         Temple University
         BS Architecture
         SPECIAL TRAINING
         Revit, NavisWorks, BIM 360
         ACHIEVEMENTS
         Guest presenter at 2011 Ivy Plus Technology
         Symposium

         Guest presenter at 2012 Ivy Plus Conference
         YEARS OF EXPERIENCE
         23






        Rob has spear-headed the BIM division at Barr & Barr, the foundation on which our procedures are built ranging from 3D
        Logistics Modeling, Coordination, FM As-Built deliverables and 360 Spherical Photography. He over sees the BIM Department
        for Barr & Barr keeping his team on the forefront of the latest practices and technology. His eff orts have created our approach
        in reducing construction durations and saving owners money.

        SIMILAR PROJECTS

        Cornell University - Roosevelt Island, NY              Northern Westchester Hospital, Mount Kisco, NY
        300 Well Geo Thermal Field                             Surgical Services
        Th  e Bloomberg Center is a new four story, 150,000 SF Facilitythat   Th  e Surgical Services Project expanded the existing surgical suite
        was constructed of steel and concrete.  Th  e facade consists of a  by 18,000 s.f.  adding six new OR’s and 14 PACU stations to their
        unitized system of metal panels, windows and curtainwall.  Th e  surgical suite.
        building is heated and cooled by a closed loop geothermal system.
                                                               Community Medical Center, Toms River, NJ
        Th  e roof is covered with approximately 40,000 SF of photovoltaic
                                                               ED Expansion/Renovation
        panels with  a netzero energy usage.
                                                               Th  e phased expansion and renovation consisted of new four-story and
        Princeton University - Princeton, NJ                   two-story additions to the existing Emergency Department along
        Roof Top Chillers & Back Up Generators                 with 30,000 square feet of renovations to the existing structure.
        Peretsman-Scully Hall & Princeton Neuroscience Institute is a new  Adjacent to the new addition, a new 175 car parking structure was
        two-building complex that houses a state-of-the-art data center,  also built which ties into the new walk-in entrance.
        research facilities, teaching classrooms, faculty offi  ces, wet and dry
        laboratories,  a lecture hall, vivarium, and MRI’s and RF shielded  Treatment Rooms
        rooms.  Th  is new 249,000 SF building included rooftop chillers  The final two phases of a five year construction plan
        and backup generators.                                 included the renovation of 30,000 sf into new treatment
                                                               rooms, triage area and new ambulance drop-off area.
        Capital Health System - Trenton, NJ
        HVAC Upgrades
                                                               New Addition
        Th  is 107,000 SF project consisted of new construction and  renovated
                                                               Th  e project consisted of a one-story, 24,000 s.f. addition atop the
        area’s.  Work was performed while the hospital stayed operational.
                                                               existing 4th fl oor patient wing.
        Scope of work included renovations to: Sleep Labs,  Data Center,
        Pediatrics, Neonatal ICU as well as a new 12 Bed Medica/Surgical   Robert Wood Johnson University Hospital, New Brunswick, NJ
        Unit.  In order for this facility to support all the increased areas  Parking Deck and East Tower
        there was a 17,550 SF upgrade to the HVAC system including new:  Th  e project includes a nine-story garage capable of holding 650+ cars
        15K Switch Gear, 5Kv Outdoor Substation, Generator and Chiller.   and a new service vault with new substation and generators. On top
                                                               of the garage will be two stories of offi  ce space and a data center. Th e
                                                               structure and building systems are designed for additional vertical
                                                               expansion in the future.