Page 14 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 14
Robert Goslin
BIM / Logistics
EDUCATION
Temple University
BS Architecture
SPECIAL TRAINING
Revit, NavisWorks, BIM 360
ACHIEVEMENTS
Guest presenter at 2011 Ivy Plus Technology
Symposium
Guest presenter at 2012 Ivy Plus Conference
YEARS OF EXPERIENCE
23
Rob has spear-headed the BIM division at Barr & Barr, the foundation on which our procedures are built ranging from 3D
Logistics Modeling, Coordination, FM As-Built deliverables and 360 Spherical Photography. He over sees the BIM Department
for Barr & Barr keeping his team on the forefront of the latest practices and technology. His eff orts have created our approach
in reducing construction durations and saving owners money.
SIMILAR PROJECTS
Cornell University - Roosevelt Island, NY Northern Westchester Hospital, Mount Kisco, NY
300 Well Geo Thermal Field Surgical Services
Th e Bloomberg Center is a new four story, 150,000 SF Facilitythat Th e Surgical Services Project expanded the existing surgical suite
was constructed of steel and concrete. Th e facade consists of a by 18,000 s.f. adding six new OR’s and 14 PACU stations to their
unitized system of metal panels, windows and curtainwall. Th e surgical suite.
building is heated and cooled by a closed loop geothermal system.
Community Medical Center, Toms River, NJ
Th e roof is covered with approximately 40,000 SF of photovoltaic
ED Expansion/Renovation
panels with a netzero energy usage.
Th e phased expansion and renovation consisted of new four-story and
Princeton University - Princeton, NJ two-story additions to the existing Emergency Department along
Roof Top Chillers & Back Up Generators with 30,000 square feet of renovations to the existing structure.
Peretsman-Scully Hall & Princeton Neuroscience Institute is a new Adjacent to the new addition, a new 175 car parking structure was
two-building complex that houses a state-of-the-art data center, also built which ties into the new walk-in entrance.
research facilities, teaching classrooms, faculty offi ces, wet and dry
laboratories, a lecture hall, vivarium, and MRI’s and RF shielded Treatment Rooms
rooms. Th is new 249,000 SF building included rooftop chillers The final two phases of a five year construction plan
and backup generators. included the renovation of 30,000 sf into new treatment
rooms, triage area and new ambulance drop-off area.
Capital Health System - Trenton, NJ
HVAC Upgrades
New Addition
Th is 107,000 SF project consisted of new construction and renovated
Th e project consisted of a one-story, 24,000 s.f. addition atop the
area’s. Work was performed while the hospital stayed operational.
existing 4th fl oor patient wing.
Scope of work included renovations to: Sleep Labs, Data Center,
Pediatrics, Neonatal ICU as well as a new 12 Bed Medica/Surgical Robert Wood Johnson University Hospital, New Brunswick, NJ
Unit. In order for this facility to support all the increased areas Parking Deck and East Tower
there was a 17,550 SF upgrade to the HVAC system including new: Th e project includes a nine-story garage capable of holding 650+ cars
15K Switch Gear, 5Kv Outdoor Substation, Generator and Chiller. and a new service vault with new substation and generators. On top
of the garage will be two stories of offi ce space and a data center. Th e
structure and building systems are designed for additional vertical
expansion in the future.