Page 13 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 13

Nunzio Cuttitta

                                                        Superintendent


         EDUCATION
         Kingsborough College
         AA Business

         NYC Department of Building – Licensed
         Superintendent
         YEARS OF EXPERIENCE
         34












                                                                                           q
        Nunzio has supervised a broad array of projects. He’s nothing if not adaptable and he’s well equipped to identify fi xes andpp  y y  p  g g  p p  q pppp  y y
                                            p jj
        alternatives in the fi eld. Nunzio will also bring a personal approach to your project, choosing contractors whose skills andgpgp  ppp  y y  p  g g
                                                             p
                                                                            p jj
                                                                       g
        teamwork he can vouch for fi rsthand whenever possible. His ongoing professional and personal relationships with pastpp  g g  g pp  p p  p p  p p
        coworkers, contractors, subcontractors and owners are testament to his fairness, willingness to get his hands dirty and
        accommodating, easy-going nature.
        SIMILAR PROJECTS
        Trinitas Hospital - Elizabeth, NJ                       present Aaron Building.  Th  e new building also connects to the
        4th Floor Oncology Care Center
                                                                existing Gellman Building.  A new elevator and utility core serves all
        Located in the heart of downtown Elizabeth the project includes
                                                                three (3) buildings. Renovation of the existing Aaron building was
        the operational headquarters & dispatch center for the Mobile
                                                                done with the new construction. In addition, the new Ambulatory
        Intensive Care Emergency Response units for Trinitas Regional
                                                                Surgery facility was built in the Garage Basement across from the
        Medical Center, as well as the Community Education Center
                                                                new addition on 48th Street.  A two (2) story bridge connects this
        and offi  ces of the Trinitas Foundation. Th  e facility is a 2 story
                                                                facility to the new building as a direct connection between in-patient
        steel & concrete structure located on a 2 acre site previously
                                                                and Ambulatory Surgery.  New elevators were constructed in the
        occupied by  retail stores and an offi  ce warehouse all on the
                                                                Garage to complement this connection.
        banks of the Elizabeth River.
                                                                St. Ann’s Home -  Jersey City, NJ
        NY Hospital Queens -  Flushing, NY                      Adult Medical Day Care Center
        Master Plan - West Wing Addition                        Th  e St. Ann’s Home has been providing care for the elderly since
        Th  e New York Hospital Queens Master Plan Project featured a  1911. Th  e latest expansion to their campus includes a two-story,
        seven-story, 202,000 square foot addition, as well as renovations to  steel-frame building featuring brick veneer, a solar panel glazed
        adjoining areas of the Hospital. Th  e West Wing Addition includes  curtainwall system and a solar panel system covering the entire
        a new Ambulatory Surgery Center, new main entrance and lobby,  building roof. Th  e Adult Medical Day Care Center will provide
        Non-Invasive Cardiology Suite, two fl oors of Med/Surg beds and  rehabilitative and educational services for stroke patients from the
        Medical Practices offi  ces on the basement level.      adjacent nursing home.

        Catholic Health Services - Melville, NY
        Data Center Expansion                                   Bayer Healthcare - Hanover Township, NJ
        Th  e phased renovation featured the fi t-out of new IT support areas,  U.S. Corporate Headquarters
        new MEP equipment areas and the expansion of the existing  Th  e new U. S. Headquarters for Bayer Healthcare was constructed
        emergency generator room. Th  e expansion project also included the  in two phases. Th e fi rst linked two existing offi  ce structures with a
        installation of two new roof-top chillers and steel support systems,  fi ve-story glass atrium. Each of the structures was renovated; one
        two new 1500 KW generators, computer room air handler units  with a two-story vertical addition. In addition to these Class A offi  ce
        and extensive electrical systems upgrade.               buildings, one of the existing research buildings was rejuvenated as
                                                                a fi tness center. As part of this phase, approximately 2,500 on-grade
        Maimonides Medical Center - Brooklyn, NY                parking spaces was constructed within parking fi elds surrounding
        Facilities Modernization
                                                                the buildings.
        Th  e Maimonides Medical Center Major Modernization Project
        consists of the construction of a nine (9) story addition to the
   8   9   10   11   12   13   14   15   16   17   18