Page 18 - Barr&Barr_Trinitas RFQ No. CHP-2010_Flipbook
P. 18

B. Andrew Price, PE - (Affi  liated Engineers)

                                                           QA/QC


         EDUCATION
         University of Iowa
         BS Mechanical Engineering

         University of Iowa
         Master of Science
         Mechanical Engineering

         YEARS OF EXPERIENCE
         26










        Andrew is a key leader and member of AEI’s Energy and Utilities practice. During his professional career, he has accumulated
        planning, system design, project management, and business development experience – primarily focused on the energy and
        utility infrastructure market sectors.



        SIMILAR PROJECTS

        Pennsylvania State University - State College, PA      University of Kansas - Lawrence, KS
                                                               Campus Master Plan
        Steam System Repair
                                                               Energy & Utilities Planner for a comprehensive campus master plan.
        Project Manager for the design and modifi cations to existing high
                                                               As a member of a multidisciplinary planning team, AEI assisted
        and low pressure steam distribution system on campus.  Experience
                                                               in two capacities: sustainability planner and utility infrastructure
        includes more than 25 projects to repair and upgrade the existing
                                                               planner. As sustainability planner, AEI advanced and integrated the
        distribution systems on campus.  AEI’s services included: inspection
                                                               eff orts of the team’s transportation planning, landscape planning,
        of the piping system to document defi ciencies with the anchoring,
                                                               urban design, energy and utility and water management strategies
        thermal expansion, and piping supports; design of improvements
                                                               to realize university sustainability goals and objectives. As utility
        necessary to correct the defi ciencies, including the replacement of
                                                               infrastructure planner, AEI assessed the quality and service capabilities
        expansion devices and piping restraints such as anchors, guides
                                                               of the existing system as the basis of making recommendations for
        and supports; and post-installation analysis of the piping stresses
                                                               system investments needed to support the university’s program of
        resulting from thermal expansion of the steam line.
                                                               growth and development. Th  is includes analysis of energy demand
        University of Illinois - Urbana-Champaign, IL          and mechanical systems at the building scale.
        Utilities Production & Distribution Master Plan
        Project Manager for utility master planning services including an   University of Michigan - Ann Arbor, MI
                                                               Central Power Plant (CPP) Boiler 3 & 4 Burner Replacement
        existing infrastructure conditions assessment, an energy systems
                                                               Project Manager for enhancements to CPP boilers 3 & 4 which
        load analysis, an energy supply and distribution options analysis,
                                                               include new fuel oil train and controls, adding variable speed drives
        and recommended implementation strategy plans. Th e project
                                                               to the forced draft (FD) fans, relocating FD fan 3 to allow for better
        encompassed all energy production and distribution systems on the
                                                               maintenance, reconfi guring and replacing desuperheaters with proper
        campus, including chilled water, steam, medium- and high-voltage
                                                               piping confi guration, adding view ports, repairing air preheater seals,
        electrical, natural gas, fuel oil, and compressed air. Th  e objective of
                                                               and installing missing superheater tubes.
        the initiative was to have a comprehensive long-term utility master

        plan in place, complementary to the sustainability objectives of the
        existing UIUC Climate Action Plan, to aid in the execution of phased
        projects that will safely and reliably meet the current and future
        campus energy needs. Th e fi nal plan accommodates a 5, 10, and 20
        year planning horizon, including measures required to comply with
        the University goal to discontinue the use of conventional coal by
        2017 as well as a goal to utilize 25% renewable fuels by 2025 with
        redundant fuel sources.
   13   14   15   16   17   18   19   20   21   22   23