Ball Plant III CHP Addition
Acushnet – Blackburg, VA
References: EPC Contractor’s Role:
Robert Espindola AEI worked closely with the Design Build contractors to
Energy Systems Program Manager meet an aggressive schedule for installation.
Acushnet
P: (800) 225-8500 Construction Dates:
E: Robert_Espindola@acushnetgolf.com Construction: 02/2015 - 10/2015
Date of operation: 10/2015
Project Description:
Th e project was executed as design build and design assist. Funded by Current Operating Status:
Acushnet. Acushnet added a 2 MW natural gas engine generator with Operational
a heat recovery steam generator (HRSG) to the existing Ball Plant III.
Th e combined heat and power plant is located in a new metal insulated Description of Claims:
building that was constructed as an addition to an existing metal building. None
Th e mechanical, plumbing and fi re protection design document development
was coordinated and phased to accommodate an accelerated schedule.
Construction Cost:
$2 Million
Project Schedule:
Project design started in 2015 with substantial completion by October
2015. Start-up services were completed early 2016. Th e design build
team was on board from the beginning.