Ball Plant III CHP Addition

                                                   Acushnet – Blackburg, VA




























         References:                                               EPC Contractor’s Role:
         Robert Espindola                                          AEI worked closely with the Design Build contractors to
         Energy Systems Program Manager                            meet an aggressive schedule for installation.
         Acushnet
         P: (800) 225-8500                                         Construction Dates:
         E: Robert_Espindola@acushnetgolf.com                      Construction: 02/2015 - 10/2015
                                                                   Date of operation: 10/2015
         Project Description:
         Th  e project was executed as design build and design assist. Funded by  Current Operating Status:
         Acushnet. Acushnet added a 2 MW natural gas engine generator with  Operational
         a heat recovery steam generator (HRSG) to the existing Ball Plant III.
         Th  e combined heat and power plant is located in a new metal insulated  Description of Claims:
         building that was constructed as an addition to an existing metal building.   None
         Th  e mechanical, plumbing and fi re protection design document development
         was coordinated and phased to accommodate an accelerated schedule.

         Construction Cost:
         $2 Million

         Project Schedule:
         Project design started in 2015 with substantial completion by October
         2015. Start-up services were completed early 2016. Th  e design build
         team was on board from the beginning.