Binsky & Snyder
                                                Binsky & Snyder has assembled a superbly qualifi ed team of engineers and constructors
                                                highly experienced in New Jersey CHP construction.
            It is Barr & Barr’s
                                                Th  eir unique experience combines Binsky & Snyder’s local construction experience
                philosophy to                   with other team members expertise forming a project team committed to delivering
                                                ultimate value by employing a true integrated project delivery methodology. Binsky and
           provide the highest                  Snyder has constructed 11 CHP facilities ranging from 1.3-14 megawatts delivering
                                                the highest quality and reliability for clients in the state of NJ.
           quality construction
                                                •  Provide a Reliable and Proven Track CHP and Chilled Water confi guration, attaining
         services to each of our                 greater than 97% availability
                                                •  Accelerated project delivery schedule with procurement of long lead equipment and
                    clients.                     fast track construction implementation.


                                                Together, our project team  can successfully design, construct and place into service a
                                                CHP system consistent with the project Basis of Design that is designed and engineered
                                                to be installed at the lowest possible cost; while achieving the highest possible reliability
                                                and effi  ciency standards dictated by the NJERB.